Backland development in Godalming

Backland Development is a new brand within the S&K Group, helping homeowners in Godalming make use of land behind and beside their houses. We buy suitable plots directly, subject to survey, title and contract, and we also offer sales subject to planning, options, planning promotion, joint ventures and design and build.

We won’t claim a long list of past schemes on your street, because we’re new. What we will do is give you a straight view of your plot, put the main terms in writing as heads of terms, and expect your own solicitor to check them. On option and promotion agreements, your reasonable legal fees are covered, with the cap agreed in advance.

Planning authority
Waverley Borough Council
Postcodes
GU7
Noon sun, 21 March
About 39°
Noon sun, 21 December
About 15°
Planning plan
Local Plan
County
Surrey

The kinds of plot we look at in Godalming

Sometimes the plot that works isn’t a single garden at all. Two or three adjoining back gardens in Godalming can often be combined into one scheme with one shared access, giving a better layout than any of them alone. Each owner keeps their house, and a collaboration agreement with an equalisation clause shares the value fairly. If your own garden is too narrow or too short to work on its own, it’s worth asking whether the neighbours might be interested too.

Planning and light in Godalming

Daylight is one of the first things Waverley Borough Council will look at on a garden plot. At midday on 21 March the sun in Godalming sits about 39° above the horizon, so a typical two-storey eaves line around 5 metres high throws a shadow of roughly 6.2 m. On 21 December the midday sun is only about 15° up and shadows are far longer. That’s why the gap between the existing house and the new one, and the height of the new roof, matter so much. We test layouts against the council’s Local Plan and any daylight guidance it publishes before anything is submitted.

Section showing noon sun and shadows in Godalming: about 39 degrees on 21 March and 15 degrees on 21 December21 m21 Mar, noon: sun 39°, shadow 6.2 m21 Dec, noon: sun 15°, shadow 18.2 mExistingNew home
Noon sun in Godalming on 21 March sits about 39° above the horizon, so a typical two-storey eaves line (about 5 m) throws a shadow of roughly 6.2 m. In December the sun is only about 15° up and shadows stretch much further. Drawn for a garden facing north, where it matters most.

What we can do in Godalming

Sell or partner

Design and build

By plot type

What happens next

The next step is simple. Use the form or call us with your Godalming address and, if you can, a rough idea of the garden’s length, width and how a vehicle might reach it. We’ll do a desktop check, talk it through with you and arrange a site visit if the plot looks viable. There’s no cost and no obligation.

Questions about garden plots in Godalming

Is there a charge for assessing my plot in Godalming?

No. The garden plot appraisal is free and carries no obligation. We do a desktop check of access, size, title and the planning picture, talk it through with you and arrange a site visit if it looks viable. You can stop at any point without owing anything.

Can you build a house in my back garden in Godalming that I keep?

Yes. Our design and build route covers the survey, design, planning application, Building Regulations, construction and handover, while the land and the new home stay yours. You can sell it, let it or use it for family. You’ll get a written quote once the design and survey are done, and any earlier price range is a guide only.

How much is my garden plot in Godalming worth?

There’s no honest figure without looking at the plot. Value depends on location, size, access, title and planning, and costs such as a long drive or difficult ground come straight off what the land is worth. Our free appraisal looks at all of that before we talk about price.

How long does a garden plot deal in Godalming usually take?

It depends on the route. A sale of a plot that already has planning moves at the pace of the solicitors and your lender. Routes that need planning usually take many months, because of surveys, design, the council’s decision period and any amendments. Design and build usually takes well over a year in total.

Nearby

Find out what your garden could become

Free garden plot appraisal. No cost, no obligation, and a straight answer if it won’t work.