Build a new home in your garden in Dunstable

If you own a house in Dunstable with a long or wide garden, you don’t have to sell the land to benefit from it. We can design a separate new home for the plot, apply to Central Bedfordshire Council for planning permission, and build it while you carry on living next door.

When it’s finished, the house is yours to sell, let or keep for family. As a new name in the S&K Group we don’t trade on past jobs; every project starts the same way: a free, no-obligation appraisal of your garden, then a measured survey and design, then a written quote once the real costs are known.

Timber-frame house under construction with scaffolding at the bottom of a back garden, seen from the patio
Planning authority
Central Bedfordshire Council
Postcodes
LU6
Noon sun, 21 March
About 38°
Shadow from a 5 m eaves line
About 6.4 m
Planning plan
Local Plan
County
Bedfordshire

The local picture in Dunstable

In Dunstable, applications for a new home in a garden are decided by Central Bedfordshire Council, which weighs them against the council’s Local Plan and national policy. Officers look at access, privacy, daylight, parking, bins, drainage and how much garden is left for each house, and neighbours can comment during consultation.

We read the local policies and any design guidance before drawing a line, and check the planning history of nearby plots for decisions that show how the council has applied them. If the policy picture is uncertain, pre-application advice lets us test the scheme with officers before the formal application goes in.

Section showing noon sun and shadows in Dunstable: about 38 degrees on 21 March and 15 degrees on 21 December21 m21 Mar, noon: sun 38°, shadow 6.4 m21 Dec, noon: sun 15°, shadow 19.1 mExistingNew home
This section is worked out for the latitude of Dunstable: around 38° of sun at midday in late March and about 15° at midwinter. It shows why the gap between your house and a new home behind it is about light as well as privacy. Garden assumed to face north.

What happens next in Dunstable

Once you ask for an appraisal of your Dunstable garden, we start with the paperwork: the title plan, any covenants, flood maps, tree and conservation designations, and planning decisions on nearby plots. A short call follows, then a site visit if the plot passes the desk check. You get our straight view of what’s realistic and what happens next, with no obligation to go further.

  1. Free plot appraisal

    We check the title plan, access, constraints and planning policy from our desk, talk the plot through with you, and visit if it looks viable. There’s no cost and no obligation.

  2. Survey and design

    A measured survey records levels, boundaries, trees and neighbouring windows. We then design a layout and house that suit the plot, the street and your budget, and decide whether pre-application advice is worth seeking.

  3. Planning and approvals

    We submit the planning application and manage it to a decision, then deal with conditions, Building Regulations approval, the structural warranty, any build-over agreement and the new utility connections.

  4. Handover

    You receive the completion certificate, warranty documents, Energy Performance Certificate, manuals and utility details, so the new home is ready to move into, let or put on the market.

Worth checking early

  • Building and selling a new home can change your tax position compared with selling only your house; take advice from a tax adviser first.
  • You fund the build and carry the cost risk; ground conditions, sewer diversions or supply upgrades found later can move the price.
  • Planning can be refused, and money spent on surveys, design and the application isn’t recovered if it is — which is why we start with an appraisal.

Questions about garden plots in Dunstable

How long does planning take for a new home in a Dunstable garden?

The statutory period for deciding a minor application, such as a single new home, is 8 weeks from the date the council receives a valid application, in both England and Wales. In practice many applications take longer, and the council may ask you to agree an extension in writing. Surveys and design before submission add time, and conditions may need approving afterwards.

Will I pay Community Infrastructure Levy on a new home in Dunstable?

Only if Central Bedfordshire Council has adopted a Community Infrastructure Levy charging schedule; not every council has. Where it applies, it can be charged on a new home of any size. A self-build exemption exists for people building a home to live in, but it must be claimed before work starts, so we check the position at design stage.

Can the new home in my Dunstable garden connect to the main sewer?

Usually, yes, but the route and depth decide how easily. The new home needs its own foul connection, agreed with the water company, and gravity drainage is simplest where the sewer sits lower than the new floor. If it doesn’t, a pumped connection may be needed. Where a public sewer runs under your garden, a build-over agreement or diversion may also be required.

Can I build a house in my garden in Dunstable and keep the land?

Yes. On our design and build route you remain the owner while we design the home, apply to Central Bedfordshire Council for planning, deal with Building Regulations and build it. The finished house can be sold, let or kept for family. Whether your plot can take a house depends on access, space, neighbours and local policy, and the decision rests with the council.