Build a new home in your garden in Hastings

For a garden in Hastings to take a new house, three things have to line up: a safe way in, enough space to keep both homes private and light, and services that can reach the plot at sensible cost. Our free appraisal looks at all three before you spend anything.

If they line up, we move on to a measured survey, design and, where useful, pre-application advice from Hastings Borough Council. Planning permission is the council’s decision, so the design is shaped around the tests its officers apply rather than the largest house the plot could possibly hold.

Timber-frame house under construction with scaffolding at the bottom of a back garden, seen from the patio
Planning authority
Hastings Borough Council
Postcodes
TN34, TN37, TN38
Noon sun, 21 March
About 39°
Shadow from a 5 m eaves line
About 6.1 m
Planning plan
Local Plan
County
East Sussex

How it plays out in Hastings

Daylight is one of the first things Hastings Borough Council will check on a garden house. At midday on 21 March the sun in Hastings stands roughly 39° above the horizon, so an eaves line about 5 m high casts a shadow of around 6.1 m. On 21 December the sun is only about 16° up and shadows stretch far longer.

That’s why the gap between your house and the new one, and the height of the new roof, are set by measurement rather than guesswork. A lower eaves line, a hipped roof or a single-storey section can make a real difference to the gardens either side.

Section showing noon sun and shadows in Hastings: about 39 degrees on 21 March and 16 degrees on 21 December21 m21 Mar, noon: sun 39°, shadow 6.1 m21 Dec, noon: sun 16°, shadow 17.8 mExistingNew home
Noon sun in Hastings on 21 March sits about 39° above the horizon, so a typical two-storey eaves line (about 5 m) throws a shadow of roughly 6.1 m. In December the sun is only about 16° up and shadows stretch much further. Drawn for a garden facing north, where it matters most.

How we’d take it forward in Hastings

From appraisal to a decision from Hastings Borough Council, each step in Hastings is agreed before it starts. After the site visit we quote for survey and design; after design we prepare the application; after permission we deal with conditions and technical approvals and give you a written build quote. Each stage is a separate decision for you, with its cost set out first.

  1. Free plot appraisal

    We check the title plan, access, constraints and planning policy from our desk, talk the plot through with you, and visit if it looks viable. There’s no cost and no obligation.

  2. Survey and design

    A measured survey records levels, boundaries, trees and neighbouring windows. We then design a layout and house that suit the plot, the street and your budget, and decide whether pre-application advice is worth seeking.

  3. Written quote and build

    Once design and survey are complete you get a written quote. The build runs in stages — access and groundworks, foundations, frame and roof, fit-out and external works — with inspections at each key point.

  4. Handover

    You receive the completion certificate, warranty documents, Energy Performance Certificate, manuals and utility details, so the new home is ready to move into, let or put on the market.

Worth checking early

  • A build next door means months of noise, deliveries and contractors near your home; good planning reduces the disruption but doesn’t remove it.
  • You fund the build and carry the cost risk; ground conditions, sewer diversions or supply upgrades found later can move the price.
  • Your own garden gets smaller and the new home will be visible from your house, so screening and separation matter for both homes.

Your questions, answered for Hastings

Do you visit gardens in Hastings before giving advice?

We start with a desk review of the title plan, access, constraints and planning policy, then talk the plot through with you. If it looks viable, we arrange a site visit to see the access, levels, trees and neighbouring windows for ourselves. The appraisal is free and carries no obligation.

Who decides planning for a garden house in Hastings?

Hastings Borough Council decides applications for addresses in Hastings, using the council’s Local Plan, national policy and its own design guidance. Neighbours and consultees such as highways officers can comment, and the decision is made by the council’s planning officers or, where the rules allow, its planning committee. Pre-application advice from the council can help test a scheme before the formal application is submitted.

Can I build a house in my garden in Hastings and keep the land?

Yes. On our design and build route you remain the owner while we design the home, apply to Hastings Borough Council for planning, deal with Building Regulations and build it. The finished house can be sold, let or kept for family. Whether your plot can take a house depends on access, space, neighbours and local policy, and the decision rests with the council.

How long does planning take for a new home in a Hastings garden?

The statutory period for deciding a minor application, such as a single new home, is 8 weeks from the date the council receives a valid application, in both England and Wales. In practice many applications take longer, and the council may ask you to agree an extension in writing. Surveys and design before submission add time, and conditions may need approving afterwards.

Other options in Hastings

Build in your garden near Hastings

Find out what your garden could become

Free garden plot appraisal. No cost, no obligation, and a straight answer if it won’t work.