Build a new home in your garden in Leigh

Building a second home behind your own in Leigh is a construction project with one unusual feature: you live beside the site from the first spade to the last coat of paint. That shapes how we plan it, from the fence that separates your garden on day one to where deliveries park.

The route covers everything between an idea and a finished house. We survey and design, prepare and submit the planning application, arrange Building Regulations approval and the structural warranty, organise new water, drainage and electricity connections, and then build. You keep ownership of the land throughout.

Timber-frame house under construction with scaffolding at the bottom of a back garden, seen from the patio
Planning authority
Wigan Council
Postcodes
WN7
Noon sun, 21 March
About 37°
Shadow from a 5 m eaves line
About 6.8 m
Planning plan
Local Plan
County
Greater Manchester

How it plays out in Leigh

Daylight is one of the first things Wigan Council will check on a garden house. At midday on 21 March the sun in Leigh stands roughly 37° above the horizon, so an eaves line about 5 m high casts a shadow of around 6.8 m. On 21 December the sun is only about 13° up and shadows stretch far longer.

That’s why the gap between your house and the new one, and the height of the new roof, are set by measurement rather than guesswork. A lower eaves line, a hipped roof or a single-storey section can make a real difference to the gardens either side.

Section showing noon sun and shadows in Leigh: about 37 degrees on 21 March and 13 degrees on 21 December21 m21 Mar, noon: sun 37°, shadow 6.8 m21 Dec, noon: sun 13°, shadow 21.5 mExistingNew home
This section is worked out for the latitude of Leigh: around 37° of sun at midday in late March and about 13° at midwinter. It shows why the gap between your house and a new home behind it is about light as well as privacy. Garden assumed to face north.

From first call to decision

Getting started in Leigh takes one step from you: send your address and a few photos of the garden, or call us. We check the title plan, access and planning constraints from our desk, then talk the plot through. If it looks viable we arrange a visit, discuss whether you want to sell, let or keep the new home, and set out the survey and design stage in writing before you commit.

  1. Free plot appraisal

    We check the title plan, access, constraints and planning policy from our desk, talk the plot through with you, and visit if it looks viable. There’s no cost and no obligation.

  2. Survey and design

    A measured survey records levels, boundaries, trees and neighbouring windows. We then design a layout and house that suit the plot, the street and your budget, and decide whether pre-application advice is worth seeking.

  3. Planning and approvals

    We submit the planning application and manage it to a decision, then deal with conditions, Building Regulations approval, the structural warranty, any build-over agreement and the new utility connections.

  4. Handover

    You receive the completion certificate, warranty documents, Energy Performance Certificate, manuals and utility details, so the new home is ready to move into, let or put on the market.

Worth checking early

  • Planning can be refused, and money spent on surveys, design and the application isn’t recovered if it is — which is why we start with an appraisal.
  • A build next door means months of noise, deliveries and contractors near your home; good planning reduces the disruption but doesn’t remove it.
  • You fund the build and carry the cost risk; ground conditions, sewer diversions or supply upgrades found later can move the price.

Questions about garden plots in Leigh

Will I pay Community Infrastructure Levy on a new home in Leigh?

Only if Wigan Council has adopted a Community Infrastructure Levy charging schedule; not every council has. Where it applies, it can be charged on a new home of any size. A self-build exemption exists for people building a home to live in, but it must be claimed before work starts, so we check the position at design stage.

Can the new home in my Leigh garden connect to the main sewer?

Usually, yes, but the route and depth decide how easily. The new home needs its own foul connection, agreed with the water company, and gravity drainage is simplest where the sewer sits lower than the new floor. If it doesn’t, a pumped connection may be needed. Where a public sewer runs under your garden, a build-over agreement or diversion may also be required.

How close can a new house be to my own in Leigh?

There’s no single national distance. Many councils use separation guides of around 21 metres between facing back windows and around 12 to 15 metres between a back window and a blank side wall, but the guidance used by Wigan Council decides. Window positions, ground levels, roof shape and screening all affect what is acceptable, which is why we survey before we design.

Who decides planning for a garden house in Leigh?

Wigan Council decides applications for addresses in Leigh, using the council’s Local Plan, national policy and its own design guidance. Neighbours and consultees such as highways officers can comment, and the decision is made by the council’s planning officers or, where the rules allow, its planning committee. Pre-application advice from the council can help test a scheme before the formal application is submitted.

Other options in Leigh

Build in your garden near Leigh

Find out what your garden could become

Free garden plot appraisal. No cost, no obligation, and a straight answer if it won’t work.