Build a new home in your garden in Eastleigh

A new home in your Eastleigh garden can be built to sell, to let or for someone in the family, and the right design differs for each. A home for sale needs its own title, a structural warranty for buyers’ lenders and a layout with wide appeal. A family home might put level access or a shared garden gate first.

We talk that through at the start, because it changes the size, the specification and the legal set-up. From there we take the plot through design, planning, approvals and construction, handing over a finished home with its certificates and warranty documents.

Timber-frame house under construction with scaffolding at the bottom of a back garden, seen from the patio
Planning authority
Eastleigh Borough Council
Postcodes
SO50
Noon sun, 21 March
About 39°
Shadow from a 5 m eaves line
About 6.2 m
Planning plan
Local Plan
County
Hampshire

What the council will look at in Eastleigh

Daylight is one of the first things Eastleigh Borough Council will check on a garden house. At midday on 21 March the sun in Eastleigh stands roughly 39° above the horizon, so an eaves line about 5 m high casts a shadow of around 6.2 m. On 21 December the sun is only about 16° up and shadows stretch far longer.

That’s why the gap between your house and the new one, and the height of the new roof, are set by measurement rather than guesswork. A lower eaves line, a hipped roof or a single-storey section can make a real difference to the gardens either side.

Section showing noon sun and shadows in Eastleigh: about 39 degrees on 21 March and 16 degrees on 21 December21 m21 Mar, noon: sun 39°, shadow 6.2 m21 Dec, noon: sun 16°, shadow 17.9 mExistingNew home
Noon sun in Eastleigh on 21 March sits about 39° above the horizon, so a typical two-storey eaves line (about 5 m) throws a shadow of roughly 6.2 m. In December the sun is only about 16° up and shadows stretch much further. Drawn for a garden facing north, where it matters most.

From first call to decision

Once you ask for an appraisal of your Eastleigh garden, we start with the paperwork: the title plan, any covenants, flood maps, tree and conservation designations, and planning decisions on nearby plots. A short call follows, then a site visit if the plot passes the desk check. You get our straight view of what’s realistic and what happens next, with no obligation to go further.

  1. Free plot appraisal

    We check the title plan, access, constraints and planning policy from our desk, talk the plot through with you, and visit if it looks viable. There’s no cost and no obligation.

  2. Survey and design

    A measured survey records levels, boundaries, trees and neighbouring windows. We then design a layout and house that suit the plot, the street and your budget, and decide whether pre-application advice is worth seeking.

  3. Written quote and build

    Once design and survey are complete you get a written quote. The build runs in stages — access and groundworks, foundations, frame and roof, fit-out and external works — with inspections at each key point.

  4. Handover

    You receive the completion certificate, warranty documents, Energy Performance Certificate, manuals and utility details, so the new home is ready to move into, let or put on the market.

Worth checking early

  • You fund the build and carry the cost risk; ground conditions, sewer diversions or supply upgrades found later can move the price.
  • Planning can be refused, and money spent on surveys, design and the application isn’t recovered if it is — which is why we start with an appraisal.
  • Your own garden gets smaller and the new home will be visible from your house, so screening and separation matter for both homes.

Eastleigh: questions to ask

Who decides planning for a garden house in Eastleigh?

Eastleigh Borough Council decides applications for addresses in Eastleigh, using the council’s Local Plan, national policy and its own design guidance. Neighbours and consultees such as highways officers can comment, and the decision is made by the council’s planning officers or, where the rules allow, its planning committee. Pre-application advice from the council can help test a scheme before the formal application is submitted.

How long does planning take for a new home in a Eastleigh garden?

The statutory period for deciding a minor application, such as a single new home, is 8 weeks from the date the council receives a valid application, in both England and Wales. In practice many applications take longer, and the council may ask you to agree an extension in writing. Surveys and design before submission add time, and conditions may need approving afterwards.

Do you visit gardens in Eastleigh before giving advice?

We start with a desk review of the title plan, access, constraints and planning policy, then talk the plot through with you. If it looks viable, we arrange a site visit to see the access, levels, trees and neighbouring windows for ourselves. The appraisal is free and carries no obligation.

Will I pay Community Infrastructure Levy on a new home in Eastleigh?

Only if Eastleigh Borough Council has adopted a Community Infrastructure Levy charging schedule; not every council has. Where it applies, it can be charged on a new home of any size. A self-build exemption exists for people building a home to live in, but it must be claimed before work starts, so we check the position at design stage.

Other options in Eastleigh

Build in your garden near Eastleigh

Find out what your garden could become

Free garden plot appraisal. No cost, no obligation, and a straight answer if it won’t work.