Build a new home in your garden in Formby

Keep the land, gain a home: that is the design and build route we offer to garden owners in Formby. Instead of selling a plot to a developer, you commission the new house yourself, with us managing design, planning, approvals and construction on your behalf.

It suits owners who can fund a build, or arrange finance for one, and who want the finished home rather than a land sale. If that isn’t you, our sell-or-partner routes may fit better, and the free appraisal compares both for your plot so you can choose with the facts in front of you.

Timber-frame house under construction with scaffolding at the bottom of a back garden, seen from the patio
Planning authority
Sefton Metropolitan Borough Council
Postcodes
L37
Noon sun, 21 March
About 36°
Shadow from a 5 m eaves line
About 6.8 m
Planning plan
Local Plan
County
Merseyside

What shapes a plot in Formby

Construction on a Formby garden plot runs to a programme agreed once Sefton Metropolitan Borough Council has issued permission and any pre-commencement conditions have been dealt with. Groundworks and foundations come first; the shell and roof follow, then glazing, internal trades and, last of all, the drive and planting.

Weather matters. Around 21 December the sun in Formby climbs to only about 13° at midday, so winter days are short and wet ground slows the work. Where we can, we order the job so the house is weathertight before the worst months arrive.

Section showing noon sun and shadows in Formby: about 36 degrees on 21 March and 13 degrees on 21 December21 m21 Mar, noon: sun 36°, shadow 6.8 m21 Dec, noon: sun 13°, shadow 21.7 mExistingNew home
This section is worked out for the latitude of Formby: around 36° of sun at midday in late March and about 13° at midwinter. It shows why the gap between your house and a new home behind it is about light as well as privacy. Garden assumed to face north.

What happens next in Formby

If your Formby plot already has planning permission, we begin by checking the approved drawings and conditions against the site. Some permissions need detailed design, discharge of conditions or a minor amendment before they can be built. We then prepare the technical drawings, arrange Building Regulations approval and the warranty, apply for utility connections and give you a written quote to build.

  1. Free plot appraisal

    We check the title plan, access, constraints and planning policy from our desk, talk the plot through with you, and visit if it looks viable. There’s no cost and no obligation.

  2. Survey and design

    A measured survey records levels, boundaries, trees and neighbouring windows. We then design a layout and house that suit the plot, the street and your budget, and decide whether pre-application advice is worth seeking.

  3. Planning and approvals

    We submit the planning application and manage it to a decision, then deal with conditions, Building Regulations approval, the structural warranty, any build-over agreement and the new utility connections.

  4. Handover

    You receive the completion certificate, warranty documents, Energy Performance Certificate, manuals and utility details, so the new home is ready to move into, let or put on the market.

Worth checking early

  • You fund the build and carry the cost risk; ground conditions, sewer diversions or supply upgrades found later can move the price.
  • Planning can be refused, and money spent on surveys, design and the application isn’t recovered if it is — which is why we start with an appraisal.
  • A build next door means months of noise, deliveries and contractors near your home; good planning reduces the disruption but doesn’t remove it.

Formby: questions to ask

How long does planning take for a new home in a Formby garden?

The statutory period for deciding a minor application, such as a single new home, is 8 weeks from the date the council receives a valid application, in both England and Wales. In practice many applications take longer, and the council may ask you to agree an extension in writing. Surveys and design before submission add time, and conditions may need approving afterwards.

How close can a new house be to my own in Formby?

There’s no single national distance. Many councils use separation guides of around 21 metres between facing back windows and around 12 to 15 metres between a back window and a blank side wall, but the guidance used by Sefton Metropolitan Borough Council decides. Window positions, ground levels, roof shape and screening all affect what is acceptable, which is why we survey before we design.

Can I build a house in my Formby garden and then sell it?

Yes. You keep the land while the home is built, then sell the finished house. Before building starts, the plot should be given its own title through a transfer of part at HM Land Registry, and if your house is mortgaged your lender must agree to release the plot. Selling a home you’ve built can change your tax position, so take advice from a tax adviser first.

Do you visit gardens in Formby before giving advice?

We start with a desk review of the title plan, access, constraints and planning policy, then talk the plot through with you. If it looks viable, we arrange a site visit to see the access, levels, trees and neighbouring windows for ourselves. The appraisal is free and carries no obligation.

Other options in Formby

Build in your garden near Formby

Find out what your garden could become

Free garden plot appraisal. No cost, no obligation, and a straight answer if it won’t work.