Build a new home in your garden in Liverpool

Building a second home behind your own in Liverpool is a construction project with one unusual feature: you live beside the site from the first spade to the last coat of paint. That shapes how we plan it, from the fence that separates your garden on day one to where deliveries park.

The route covers everything between an idea and a finished house. We survey and design, prepare and submit the planning application, arrange Building Regulations approval and the structural warranty, organise new water, drainage and electricity connections, and then build. You keep ownership of the land throughout.

Timber-frame house under construction with scaffolding at the bottom of a back garden, seen from the patio
Planning authority
Liverpool City Council
Postcodes
L1, L2, L3, L5, L6
Noon sun, 21 March
About 37°
Shadow from a 5 m eaves line
About 6.7 m
Planning plan
Local Plan
County
Merseyside

What the council will look at in Liverpool

Wherever your house sits across L1, L2, L3 and L5, a new home behind it needs water, power and two kinds of drainage — one for waste, one for rain. We contact the utility providers early, because a long cable run, a sewer at the wrong depth or a public pipe under the lawn can change both the layout and the cost.

Rain from the new roof and drive has to be dealt with on site, and Liverpool City Council will want to see how. Where a public sewer crosses your garden, the water company may also need a build-over agreement before work starts, so we check sewer records at appraisal stage.

Section showing noon sun and shadows in Liverpool: about 37 degrees on 21 March and 13 degrees on 21 December21 m21 Mar, noon: sun 37°, shadow 6.7 m21 Dec, noon: sun 13°, shadow 21.4 mExistingNew home
Noon sun in Liverpool on 21 March sits about 37° above the horizon, so a typical two-storey eaves line (about 5 m) throws a shadow of roughly 6.7 m. In December the sun is only about 13° up and shadows stretch much further. Drawn for a garden facing north, where it matters most.

What happens next in Liverpool

Getting started in Liverpool takes one step from you: send your address and a few photos of the garden, or call us. We check the title plan, access and planning constraints from our desk, then talk the plot through. If it looks viable we arrange a visit, discuss whether you want to sell, let or keep the new home, and set out the survey and design stage in writing before you commit.

  1. Free plot appraisal

    We check the title plan, access, constraints and planning policy from our desk, talk the plot through with you, and visit if it looks viable. There’s no cost and no obligation.

  2. Survey and design

    A measured survey records levels, boundaries, trees and neighbouring windows. We then design a layout and house that suit the plot, the street and your budget, and decide whether pre-application advice is worth seeking.

  3. Planning and approvals

    We submit the planning application and manage it to a decision, then deal with conditions, Building Regulations approval, the structural warranty, any build-over agreement and the new utility connections.

  4. Written quote and build

    Once design and survey are complete you get a written quote. The build runs in stages — access and groundworks, foundations, frame and roof, fit-out and external works — with inspections at each key point.

Worth checking early

  • Planning can be refused, and money spent on surveys, design and the application isn’t recovered if it is — which is why we start with an appraisal.
  • Your own garden gets smaller and the new home will be visible from your house, so screening and separation matter for both homes.
  • Building and selling a new home can change your tax position compared with selling only your house; take advice from a tax adviser first.

Liverpool: questions to ask

How long does planning take for a new home in a Liverpool garden?

The statutory period for deciding a minor application, such as a single new home, is 8 weeks from the date the council receives a valid application, in both England and Wales. In practice many applications take longer, and the council may ask you to agree an extension in writing. Surveys and design before submission add time, and conditions may need approving afterwards.

Can the new home in my Liverpool garden connect to the main sewer?

Usually, yes, but the route and depth decide how easily. The new home needs its own foul connection, agreed with the water company, and gravity drainage is simplest where the sewer sits lower than the new floor. If it doesn’t, a pumped connection may be needed. Where a public sewer runs under your garden, a build-over agreement or diversion may also be required.

Do you visit gardens in Liverpool before giving advice?

We start with a desk review of the title plan, access, constraints and planning policy, then talk the plot through with you. If it looks viable, we arrange a site visit to see the access, levels, trees and neighbouring windows for ourselves. The appraisal is free and carries no obligation.

Can I build a house in my garden in Liverpool and keep the land?

Yes. On our design and build route you remain the owner while we design the home, apply to Liverpool City Council for planning, deal with Building Regulations and build it. The finished house can be sold, let or kept for family. Whether your plot can take a house depends on access, space, neighbours and local policy, and the decision rests with the council.

Other options in Liverpool

Build in your garden near Liverpool

Find out what your garden could become

Free garden plot appraisal. No cost, no obligation, and a straight answer if it won’t work.