Build a new home in your garden in Selby

Building a second home behind your own in Selby is a construction project with one unusual feature: you live beside the site from the first spade to the last coat of paint. That shapes how we plan it, from the fence that separates your garden on day one to where deliveries park.

The route covers everything between an idea and a finished house. We survey and design, prepare and submit the planning application, arrange Building Regulations approval and the structural warranty, organise new water, drainage and electricity connections, and then build. You keep ownership of the land throughout.

Timber-frame house under construction with scaffolding at the bottom of a back garden, seen from the patio
Planning authority
North Yorkshire Council
Postcodes
YO8
Noon sun, 21 March
About 36°
Shadow from a 5 m eaves line
About 6.8 m
Planning plan
Local Plan
County
North Yorkshire

What the council will look at in Selby

Access is where a garden plot anywhere in YO8 tends to succeed or fail. A new drive needs enough width for cars, clear visibility where it meets the road, and enough distance from neighbouring windows to keep noise and headlights in check.

Policies in the council’s Local Plan, along with any highways advice the council receives, decide the detail for your address. We measure the gap beside your house on the first visit, and if it’s too tight for a home that can be approved and built safely, we’ll tell you before any design fees are spent.

Section showing noon sun and shadows in Selby: about 36 degrees on 21 March and 13 degrees on 21 December21 m21 Mar, noon: sun 36°, shadow 6.8 m21 Dec, noon: sun 13°, shadow 22.0 mExistingNew home
Noon sun in Selby on 21 March sits about 36° above the horizon, so a typical two-storey eaves line (about 5 m) throws a shadow of roughly 6.8 m. In December the sun is only about 13° up and shadows stretch much further. Drawn for a garden facing north, where it matters most.

From first call to decision

If your Selby plot already has planning permission, we begin by checking the approved drawings and conditions against the site. Some permissions need detailed design, discharge of conditions or a minor amendment before they can be built. We then prepare the technical drawings, arrange Building Regulations approval and the warranty, apply for utility connections and give you a written quote to build.

  1. Free plot appraisal

    We check the title plan, access, constraints and planning policy from our desk, talk the plot through with you, and visit if it looks viable. There’s no cost and no obligation.

  2. Planning and approvals

    We submit the planning application and manage it to a decision, then deal with conditions, Building Regulations approval, the structural warranty, any build-over agreement and the new utility connections.

  3. Written quote and build

    Once design and survey are complete you get a written quote. The build runs in stages — access and groundworks, foundations, frame and roof, fit-out and external works — with inspections at each key point.

  4. Handover

    You receive the completion certificate, warranty documents, Energy Performance Certificate, manuals and utility details, so the new home is ready to move into, let or put on the market.

Worth checking early

  • Planning can be refused, and money spent on surveys, design and the application isn’t recovered if it is — which is why we start with an appraisal.
  • You fund the build and carry the cost risk; ground conditions, sewer diversions or supply upgrades found later can move the price.
  • Your own garden gets smaller and the new home will be visible from your house, so screening and separation matter for both homes.

Questions about garden plots in Selby

Can the new home in my Selby garden connect to the main sewer?

Usually, yes, but the route and depth decide how easily. The new home needs its own foul connection, agreed with the water company, and gravity drainage is simplest where the sewer sits lower than the new floor. If it doesn’t, a pumped connection may be needed. Where a public sewer runs under your garden, a build-over agreement or diversion may also be required.

How close can a new house be to my own in Selby?

There’s no single national distance. Many councils use separation guides of around 21 metres between facing back windows and around 12 to 15 metres between a back window and a blank side wall, but the guidance used by North Yorkshire Council decides. Window positions, ground levels, roof shape and screening all affect what is acceptable, which is why we survey before we design.

Will I pay Community Infrastructure Levy on a new home in Selby?

Only if North Yorkshire Council has adopted a Community Infrastructure Levy charging schedule; not every council has. Where it applies, it can be charged on a new home of any size. A self-build exemption exists for people building a home to live in, but it must be claimed before work starts, so we check the position at design stage.

How long does planning take for a new home in a Selby garden?

The statutory period for deciding a minor application, such as a single new home, is 8 weeks from the date the council receives a valid application, in both England and Wales. In practice many applications take longer, and the council may ask you to agree an extension in writing. Surveys and design before submission add time, and conditions may need approving afterwards.