Build a new home in your garden in Hexham

Keep the land, gain a home: that is the design and build route we offer to garden owners in Hexham. Instead of selling a plot to a developer, you commission the new house yourself, with us managing design, planning, approvals and construction on your behalf.

It suits owners who can fund a build, or arrange finance for one, and who want the finished home rather than a land sale. If that isn’t you, our sell-or-partner routes may fit better, and the free appraisal compares both for your plot so you can choose with the facts in front of you.

Timber-frame house under construction with scaffolding at the bottom of a back garden, seen from the patio
Planning authority
Northumberland County Council
Postcodes
NE46
Noon sun, 21 March
About 35°
Shadow from a 5 m eaves line
About 7.1 m
Planning plan
Local Plan
County
Northumberland

Hexham: light, access and policy

Access is where a garden plot anywhere in NE46 tends to succeed or fail. A new drive needs enough width for cars, clear visibility where it meets the road, and enough distance from neighbouring windows to keep noise and headlights in check.

Policies in the council’s Local Plan, along with any highways advice the council receives, decide the detail for your address. We measure the gap beside your house on the first visit, and if it’s too tight for a home that can be approved and built safely, we’ll tell you before any design fees are spent.

Section showing noon sun and shadows in Hexham: about 35 degrees on 21 March and 12 degrees on 21 December21 m21 Mar, noon: sun 35°, shadow 7.1 m21 Dec, noon: sun 12°, shadow 24.4 mExistingNew home
Noon sun in Hexham on 21 March sits about 35° above the horizon, so a typical two-storey eaves line (about 5 m) throws a shadow of roughly 7.1 m. In December the sun is only about 12° up and shadows stretch much further. Drawn for a garden facing north, where it matters most.

What happens next in Hexham

If your Hexham plot already has planning permission, we begin by checking the approved drawings and conditions against the site. Some permissions need detailed design, discharge of conditions or a minor amendment before they can be built. We then prepare the technical drawings, arrange Building Regulations approval and the warranty, apply for utility connections and give you a written quote to build.

  1. Free plot appraisal

    We check the title plan, access, constraints and planning policy from our desk, talk the plot through with you, and visit if it looks viable. There’s no cost and no obligation.

  2. Survey and design

    A measured survey records levels, boundaries, trees and neighbouring windows. We then design a layout and house that suit the plot, the street and your budget, and decide whether pre-application advice is worth seeking.

  3. Written quote and build

    Once design and survey are complete you get a written quote. The build runs in stages — access and groundworks, foundations, frame and roof, fit-out and external works — with inspections at each key point.

  4. Handover

    You receive the completion certificate, warranty documents, Energy Performance Certificate, manuals and utility details, so the new home is ready to move into, let or put on the market.

Worth checking early

  • Planning can be refused, and money spent on surveys, design and the application isn’t recovered if it is — which is why we start with an appraisal.
  • You fund the build and carry the cost risk; ground conditions, sewer diversions or supply upgrades found later can move the price.
  • Building and selling a new home can change your tax position compared with selling only your house; take advice from a tax adviser first.

Questions about garden plots in Hexham

Will I pay Community Infrastructure Levy on a new home in Hexham?

Only if Northumberland County Council has adopted a Community Infrastructure Levy charging schedule; not every council has. Where it applies, it can be charged on a new home of any size. A self-build exemption exists for people building a home to live in, but it must be claimed before work starts, so we check the position at design stage.

Can I build a house in my Hexham garden and then sell it?

Yes. You keep the land while the home is built, then sell the finished house. Before building starts, the plot should be given its own title through a transfer of part at HM Land Registry, and if your house is mortgaged your lender must agree to release the plot. Selling a home you’ve built can change your tax position, so take advice from a tax adviser first.

Who decides planning for a garden house in Hexham?

Northumberland County Council decides applications for addresses in Hexham, using the council’s Local Plan, national policy and its own design guidance. Neighbours and consultees such as highways officers can comment, and the decision is made by the council’s planning officers or, where the rules allow, its planning committee. Pre-application advice from the council can help test a scheme before the formal application is submitted.

How close can a new house be to my own in Hexham?

There’s no single national distance. Many councils use separation guides of around 21 metres between facing back windows and around 12 to 15 metres between a back window and a blank side wall, but the guidance used by Northumberland County Council decides. Window positions, ground levels, roof shape and screening all affect what is acceptable, which is why we survey before we design.

Other options in Hexham

Build in your garden near Hexham

Find out what your garden could become

Free garden plot appraisal. No cost, no obligation, and a straight answer if it won’t work.