- Planning authority
- Shropshire Council
- Postcodes
- SY1, SY2, SY3
- Noon sun, 21 March
- About 37°
- Shadow from a 5 m eaves line
- About 6.6 m
- Planning plan
- Local Plan
- County
- Shropshire
What the council will look at in Shrewsbury
Daylight is one of the first things Shropshire Council will check on a garden house. At midday on 21 March the sun in Shrewsbury stands roughly 37° above the horizon, so an eaves line about 5 m high casts a shadow of around 6.6 m. On 21 December the sun is only about 14° up and shadows stretch far longer.
That’s why the gap between your house and the new one, and the height of the new roof, are set by measurement rather than guesswork. A lower eaves line, a hipped roof or a single-storey section can make a real difference to the gardens either side.
How we’d take it forward in Shrewsbury
Once you ask for an appraisal of your Shrewsbury garden, we start with the paperwork: the title plan, any covenants, flood maps, tree and conservation designations, and planning decisions on nearby plots. A short call follows, then a site visit if the plot passes the desk check. You get our straight view of what’s realistic and what happens next, with no obligation to go further.
Free plot appraisal
We check the title plan, access, constraints and planning policy from our desk, talk the plot through with you, and visit if it looks viable. There’s no cost and no obligation.
Survey and design
A measured survey records levels, boundaries, trees and neighbouring windows. We then design a layout and house that suit the plot, the street and your budget, and decide whether pre-application advice is worth seeking.
Written quote and build
Once design and survey are complete you get a written quote. The build runs in stages — access and groundworks, foundations, frame and roof, fit-out and external works — with inspections at each key point.
Handover
You receive the completion certificate, warranty documents, Energy Performance Certificate, manuals and utility details, so the new home is ready to move into, let or put on the market.
Worth checking early
- Your own garden gets smaller and the new home will be visible from your house, so screening and separation matter for both homes.
- You fund the build and carry the cost risk; ground conditions, sewer diversions or supply upgrades found later can move the price.
- A build next door means months of noise, deliveries and contractors near your home; good planning reduces the disruption but doesn’t remove it.
Questions about garden plots in Shrewsbury
Can I build a house in my Shrewsbury garden and then sell it?
Yes. You keep the land while the home is built, then sell the finished house. Before building starts, the plot should be given its own title through a transfer of part at HM Land Registry, and if your house is mortgaged your lender must agree to release the plot. Selling a home you’ve built can change your tax position, so take advice from a tax adviser first.
Can I build a house in my garden in Shrewsbury and keep the land?
Yes. On our design and build route you remain the owner while we design the home, apply to Shropshire Council for planning, deal with Building Regulations and build it. The finished house can be sold, let or kept for family. Whether your plot can take a house depends on access, space, neighbours and local policy, and the decision rests with the council.
Can the new home in my Shrewsbury garden connect to the main sewer?
Usually, yes, but the route and depth decide how easily. The new home needs its own foul connection, agreed with the water company, and gravity drainage is simplest where the sewer sits lower than the new floor. If it doesn’t, a pumped connection may be needed. Where a public sewer runs under your garden, a build-over agreement or diversion may also be required.
How long does planning take for a new home in a Shrewsbury garden?
The statutory period for deciding a minor application, such as a single new home, is 8 weeks from the date the council receives a valid application, in both England and Wales. In practice many applications take longer, and the council may ask you to agree an extension in writing. Surveys and design before submission add time, and conditions may need approving afterwards.
Other options in Shrewsbury
- Plot feasibility and design
- Planning promotion for your garden plot
- Planning permission for a garden plot
- Tandem and landlocked plots
- Garage courts and yards
- Large rear gardens