Build a new home in your garden in Reigate

A new home in your Reigate garden can be built to sell, to let or for someone in the family, and the right design differs for each. A home for sale needs its own title, a structural warranty for buyers’ lenders and a layout with wide appeal. A family home might put level access or a shared garden gate first.

We talk that through at the start, because it changes the size, the specification and the legal set-up. From there we take the plot through design, planning, approvals and construction, handing over a finished home with its certificates and warranty documents.

Timber-frame house under construction with scaffolding at the bottom of a back garden, seen from the patio
Planning authority
Reigate and Banstead Borough Council
Postcodes
RH2
Noon sun, 21 March
About 39°
Shadow from a 5 m eaves line
About 6.2 m
Planning plan
Local Plan
County
Surrey

What the council will look at in Reigate

In Reigate, applications for a new home in a garden are decided by Reigate and Banstead Borough Council, which weighs them against the council’s Local Plan and national policy. Officers look at access, privacy, daylight, parking, bins, drainage and how much garden is left for each house, and neighbours can comment during consultation.

We read the local policies and any design guidance before drawing a line, and check the planning history of nearby plots for decisions that show how the council has applied them. If the policy picture is uncertain, pre-application advice lets us test the scheme with officers before the formal application goes in.

Section showing noon sun and shadows in Reigate: about 39 degrees on 21 March and 15 degrees on 21 December21 m21 Mar, noon: sun 39°, shadow 6.2 m21 Dec, noon: sun 15°, shadow 18.2 mExistingNew home
Noon sun in Reigate on 21 March sits about 39° above the horizon, so a typical two-storey eaves line (about 5 m) throws a shadow of roughly 6.2 m. In December the sun is only about 15° up and shadows stretch much further. Drawn for a garden facing north, where it matters most.

From first call to decision

If your Reigate plot already has planning permission, we begin by checking the approved drawings and conditions against the site. Some permissions need detailed design, discharge of conditions or a minor amendment before they can be built. We then prepare the technical drawings, arrange Building Regulations approval and the warranty, apply for utility connections and give you a written quote to build.

  1. Free plot appraisal

    We check the title plan, access, constraints and planning policy from our desk, talk the plot through with you, and visit if it looks viable. There’s no cost and no obligation.

  2. Planning and approvals

    We submit the planning application and manage it to a decision, then deal with conditions, Building Regulations approval, the structural warranty, any build-over agreement and the new utility connections.

  3. Written quote and build

    Once design and survey are complete you get a written quote. The build runs in stages — access and groundworks, foundations, frame and roof, fit-out and external works — with inspections at each key point.

  4. Handover

    You receive the completion certificate, warranty documents, Energy Performance Certificate, manuals and utility details, so the new home is ready to move into, let or put on the market.

Worth checking early

  • You fund the build and carry the cost risk; ground conditions, sewer diversions or supply upgrades found later can move the price.
  • Planning can be refused, and money spent on surveys, design and the application isn’t recovered if it is — which is why we start with an appraisal.
  • Building and selling a new home can change your tax position compared with selling only your house; take advice from a tax adviser first.

Questions about garden plots in Reigate

Do you visit gardens in Reigate before giving advice?

We start with a desk review of the title plan, access, constraints and planning policy, then talk the plot through with you. If it looks viable, we arrange a site visit to see the access, levels, trees and neighbouring windows for ourselves. The appraisal is free and carries no obligation.

Will I pay Community Infrastructure Levy on a new home in Reigate?

Only if Reigate and Banstead Borough Council has adopted a Community Infrastructure Levy charging schedule; not every council has. Where it applies, it can be charged on a new home of any size. A self-build exemption exists for people building a home to live in, but it must be claimed before work starts, so we check the position at design stage.

Who decides planning for a garden house in Reigate?

Reigate and Banstead Borough Council decides applications for addresses in Reigate, using the council’s Local Plan, national policy and its own design guidance. Neighbours and consultees such as highways officers can comment, and the decision is made by the council’s planning officers or, where the rules allow, its planning committee. Pre-application advice from the council can help test a scheme before the formal application is submitted.

Can I build a house in my garden in Reigate and keep the land?

Yes. On our design and build route you remain the owner while we design the home, apply to Reigate and Banstead Borough Council for planning, deal with Building Regulations and build it. The finished house can be sold, let or kept for family. Whether your plot can take a house depends on access, space, neighbours and local policy, and the decision rests with the council.

Other options in Reigate

Build in your garden near Reigate

Find out what your garden could become

Free garden plot appraisal. No cost, no obligation, and a straight answer if it won’t work.