Build a new home in your garden in Woking

For a garden in Woking to take a new house, three things have to line up: a safe way in, enough space to keep both homes private and light, and services that can reach the plot at sensible cost. Our free appraisal looks at all three before you spend anything.

If they line up, we move on to a measured survey, design and, where useful, pre-application advice from Woking Borough Council. Planning permission is the council’s decision, so the design is shaped around the tests its officers apply rather than the largest house the plot could possibly hold.

Timber-frame house under construction with scaffolding at the bottom of a back garden, seen from the patio
Planning authority
Woking Borough Council
Postcodes
GU21, GU22, KT14
Noon sun, 21 March
About 39°
Shadow from a 5 m eaves line
About 6.2 m
Planning plan
Local Plan
County
Surrey

How it plays out in Woking

Daylight is one of the first things Woking Borough Council will check on a garden house. At midday on 21 March the sun in Woking stands roughly 39° above the horizon, so an eaves line about 5 m high casts a shadow of around 6.2 m. On 21 December the sun is only about 15° up and shadows stretch far longer.

That’s why the gap between your house and the new one, and the height of the new roof, are set by measurement rather than guesswork. A lower eaves line, a hipped roof or a single-storey section can make a real difference to the gardens either side.

Section showing noon sun and shadows in Woking: about 39 degrees on 21 March and 15 degrees on 21 December21 m21 Mar, noon: sun 39°, shadow 6.2 m21 Dec, noon: sun 15°, shadow 18.4 mExistingNew home
This section is worked out for the latitude of Woking: around 39° of sun at midday in late March and about 15° at midwinter. It shows why the gap between your house and a new home behind it is about light as well as privacy. Garden assumed to face north.

The next steps, locally

From appraisal to a decision from Woking Borough Council, each step in Woking is agreed before it starts. After the site visit we quote for survey and design; after design we prepare the application; after permission we deal with conditions and technical approvals and give you a written build quote. Each stage is a separate decision for you, with its cost set out first.

  1. Free plot appraisal

    We check the title plan, access, constraints and planning policy from our desk, talk the plot through with you, and visit if it looks viable. There’s no cost and no obligation.

  2. Survey and design

    A measured survey records levels, boundaries, trees and neighbouring windows. We then design a layout and house that suit the plot, the street and your budget, and decide whether pre-application advice is worth seeking.

  3. Planning and approvals

    We submit the planning application and manage it to a decision, then deal with conditions, Building Regulations approval, the structural warranty, any build-over agreement and the new utility connections.

  4. Handover

    You receive the completion certificate, warranty documents, Energy Performance Certificate, manuals and utility details, so the new home is ready to move into, let or put on the market.

Worth checking early

  • A build next door means months of noise, deliveries and contractors near your home; good planning reduces the disruption but doesn’t remove it.
  • Planning can be refused, and money spent on surveys, design and the application isn’t recovered if it is — which is why we start with an appraisal.
  • Your own garden gets smaller and the new home will be visible from your house, so screening and separation matter for both homes.

Woking: questions to ask

How close can a new house be to my own in Woking?

There’s no single national distance. Many councils use separation guides of around 21 metres between facing back windows and around 12 to 15 metres between a back window and a blank side wall, but the guidance used by Woking Borough Council decides. Window positions, ground levels, roof shape and screening all affect what is acceptable, which is why we survey before we design.

Will I pay Community Infrastructure Levy on a new home in Woking?

Only if Woking Borough Council has adopted a Community Infrastructure Levy charging schedule; not every council has. Where it applies, it can be charged on a new home of any size. A self-build exemption exists for people building a home to live in, but it must be claimed before work starts, so we check the position at design stage.

Do new homes in Woking need a structural warranty?

If the house will ever be sold or mortgaged, in practice yes. Mortgage lenders usually expect a 10-year structural warranty on a new home, though some accept an architect’s or surveyor’s certificate, and a warranty provider inspects the work at stages during the build, so it has to be in place before construction starts. Building control approval is separate and also required; a buyer’s solicitor will ask for both.

How long does planning take for a new home in a Woking garden?

The statutory period for deciding a minor application, such as a single new home, is 8 weeks from the date the council receives a valid application, in both England and Wales. In practice many applications take longer, and the council may ask you to agree an extension in writing. Surveys and design before submission add time, and conditions may need approving afterwards.