- Planning authority
- Coventry City Council
- Postcodes
- CV1, CV2, CV3, CV5, CV6
- Noon sun, 21 March
- About 38°
- Shadow from a 5 m eaves line
- About 6.5 m
- Planning plan
- Local Plan
- County
- West Midlands
What shapes a plot in Coventry
Access is where a garden plot anywhere in CV1, CV2, CV3 and CV5 tends to succeed or fail. A new drive needs enough width for cars, clear visibility where it meets the road, and enough distance from neighbouring windows to keep noise and headlights in check.
Policies in the council’s Local Plan, along with any highways advice the council receives, decide the detail for your address. We measure the gap beside your house on the first visit, and if it’s too tight for a home that can be approved and built safely, we’ll tell you before any design fees are spent.
From first call to decision
From appraisal to a decision from Coventry City Council, each step in Coventry is agreed before it starts. After the site visit we quote for survey and design; after design we prepare the application; after permission we deal with conditions and technical approvals and give you a written build quote. Each stage is a separate decision for you, with its cost set out first.
Free plot appraisal
We check the title plan, access, constraints and planning policy from our desk, talk the plot through with you, and visit if it looks viable. There’s no cost and no obligation.
Survey and design
A measured survey records levels, boundaries, trees and neighbouring windows. We then design a layout and house that suit the plot, the street and your budget, and decide whether pre-application advice is worth seeking.
Written quote and build
Once design and survey are complete you get a written quote. The build runs in stages — access and groundworks, foundations, frame and roof, fit-out and external works — with inspections at each key point.
Handover
You receive the completion certificate, warranty documents, Energy Performance Certificate, manuals and utility details, so the new home is ready to move into, let or put on the market.
Worth checking early
- A build next door means months of noise, deliveries and contractors near your home; good planning reduces the disruption but doesn’t remove it.
- Your own garden gets smaller and the new home will be visible from your house, so screening and separation matter for both homes.
- Planning can be refused, and money spent on surveys, design and the application isn’t recovered if it is — which is why we start with an appraisal.
Coventry: questions to ask
Will I pay Community Infrastructure Levy on a new home in Coventry?
Only if Coventry City Council has adopted a Community Infrastructure Levy charging schedule; not every council has. Where it applies, it can be charged on a new home of any size. A self-build exemption exists for people building a home to live in, but it must be claimed before work starts, so we check the position at design stage.
Can I build a house in my Coventry garden and then sell it?
Yes. You keep the land while the home is built, then sell the finished house. Before building starts, the plot should be given its own title through a transfer of part at HM Land Registry, and if your house is mortgaged your lender must agree to release the plot. Selling a home you’ve built can change your tax position, so take advice from a tax adviser first.
Can I build a house in my garden in Coventry and keep the land?
Yes. On our design and build route you remain the owner while we design the home, apply to Coventry City Council for planning, deal with Building Regulations and build it. The finished house can be sold, let or kept for family. Whether your plot can take a house depends on access, space, neighbours and local policy, and the decision rests with the council.
How close can a new house be to my own in Coventry?
There’s no single national distance. Many councils use separation guides of around 21 metres between facing back windows and around 12 to 15 metres between a back window and a blank side wall, but the guidance used by Coventry City Council decides. Window positions, ground levels, roof shape and screening all affect what is acceptable, which is why we survey before we design.
Other options in Coventry
- Garden plot option agreement
- Large rear gardens
- Tandem and landlocked plots
- Corner and side plots
- Bungalows on large plots
- Combine gardens with your neighbours

