- Planning authority
- Hart District Council
- Postcodes
- GU46
- Noon sun, 21 March
- About 39°
- Shadow from a 5 m eaves line
- About 6.3 m
- Planning plan
- Local Plan
- County
- Hampshire
What the council will look at in Yateley
People living next door are consulted on every planning application, and across GU46 that applies to a family annexe just as much as to a new house. Their privacy, outlook and light carry real weight with Hart District Council. A design that keeps upper windows away from adjoining gardens, uses obscure glazing where it has to, and leaves a planted margin along the boundary gives the council fewer reasons to refuse. A quiet word with the people either side before the application goes in is often worthwhile too.
From first call to decision
Here’s what happens next for a family home in Yateley. You tell us about your plot and who the home is for, and we carry out a free desktop appraisal of access, space and the planning context. If it looks viable we visit, then set out the annexe and separate-home options. With your go-ahead we survey, design and give you a written quote, then prepare the application for Hart District Council.
Free plot appraisal
We look at your plot, access and the planning picture from the desk, talk through who will live in the new home, and visit if it looks viable. There’s no cost and no obligation.
Survey and design
A measured survey, then a design built around the person moving in: step-free routes, a ground-floor bedroom if needed and privacy for both households. You get a written quote after design and survey.
Planning and approvals
We prepare and submit the planning application and manage it with the council, which makes the decision. Before work starts, approval under the Building Regulations is in place and any CIL exemption has been claimed.
Build and handover
We build while you carry on living next door, with access, deliveries and working hours agreed up front. At handover you get the completion certificate and the paperwork you’ll need for council tax, lenders and any VAT claim.
Worth checking early
- CIL exemptions are lost if work starts before the claim is made, and can be withdrawn if the home is sold or let within three years.
- A separate home needs its own garden, parking, bins and access, so it needs more land than an annexe.
- Planning is the council’s decision, and an annexe is not a way round the rules that apply to a new house.
Yateley: questions to ask
Do I need planning permission for a granny annexe in Yateley?
Yes, almost always for a detached annexe with its own kitchen, bathroom and bedroom. Hart District Council will treat it as accommodation linked to your home and will usually add a condition so it can’t be let or sold separately. A garden building used only as a home office or gym is a different matter, but sleeping and cooking take it beyond those allowances.
Will an annexe in Yateley put up my council tax?
It might. Annexes can be banded separately, but exemptions exist for annexes lived in by certain dependent relatives, and in some cases a discount applies where family live there or the annexe is used as part of the main home. Who qualifies depends on the relative’s circumstances and how the annexe is used. Hart District Council’s council tax team can tell you how the rules apply to your household.
How long will building work disrupt my home in Yateley?
A single garden home usually takes several months on site, with the noisiest work, such as groundworks, drainage and heavy deliveries, concentrated near the start. We agree working hours, access and parking with you up front, and with the people next door where it affects them, so your household knows what each week will look like.
Is CIL payable on a family home in Yateley?
Only if Hart District Council has adopted the Community Infrastructure Levy, which its website will confirm, and we check it for you during the appraisal. Where it applies, self-build and residential annexe exemptions exist, but both must be claimed before work starts and can be withdrawn if the home is sold or let within three years of completion.
Other options in Yateley
- Bungalows on large plots
- Planning promotion for your garden plot
- Sell subject to planning
- Plot feasibility and design
- Joint venture on your garden plot
- Combine gardens with your neighbours

