- Planning authority
- Oxford City Council
- Postcodes
- OX1, OX3, OX4
- Noon sun, 21 March
- About 38°
- Shadow from a 5 m eaves line
- About 6.3 m
- Planning plan
- Local Plan
- County
- Oxfordshire
Oxford: light, access and policy
How the two households will live together shapes the planning case as much as the drawings do. If your parent will eat with you, share the garden and rely on you day to day, an annexe is the natural fit, and that is what Oxford City Council will expect the application to describe. If your son or daughter will run their own home, pay their own bills and perhaps sell up one day, it is a separate dwelling and will be assessed against the council’s Local Plan as a new house. For a family in OX1, OX3 and OX4, we help set that out clearly from the start.
From first call to decision
Getting started in Oxford costs nothing. Send us a few photos of your garden and the way in, or simply call, and we’ll look at the plot from the desk and talk through your family’s plans. If there’s a realistic scheme, we arrange a site visit. Survey and design are quoted in writing before you commit, and the build price follows once the design is settled.
Free plot appraisal
We look at your plot, access and the planning picture from the desk, talk through who will live in the new home, and visit if it looks viable. There’s no cost and no obligation.
Annexe or separate home
We set out both routes for your plot, covering what each means for planning, ownership, council tax, CIL and VAT, so you can decide with your family and advisers before design starts.
Survey and design
A measured survey, then a design built around the person moving in: step-free routes, a ground-floor bedroom if needed and privacy for both households. You get a written quote after design and survey.
Build and handover
We build while you carry on living next door, with access, deliveries and working hours agreed up front. At handover you get the completion certificate and the paperwork you’ll need for council tax, lenders and any VAT claim.
Worth checking early
- A separate home needs its own garden, parking, bins and access, so it needs more land than an annexe.
- CIL exemptions are lost if work starts before the claim is made, and can be withdrawn if the home is sold or let within three years.
- Family plans change: agree ownership, costs and what happens if circumstances change in writing, with a solicitor.
Questions about garden plots in Oxford
Can I build a separate house in my Oxford garden for my son or daughter?
Possibly, if the plot can work as a home in its own right. Oxford City Council will look at access, parking, garden space for both houses, privacy and the character of the street, as it would for any new house. If permission is granted, the plot can be transferred to your child with its own title, with your lender’s consent if the house is mortgaged.
Who owns an annexe built in my Oxford garden?
You do. An annexe stays on the title of your house and usually carries a planning condition tying it to the main home, so it can’t be transferred to the relative living in it. If a family member is paying towards it, record what they’ve put in and what happens on a sale in a written agreement drawn up by a solicitor.
How long will building work disrupt my home in Oxford?
A single garden home usually takes several months on site, with the noisiest work, such as groundworks, drainage and heavy deliveries, concentrated near the start. We agree working hours, access and parking with you up front, and with the people next door where it affects them, so your household knows what each week will look like.
Can you design a home in Oxford for a relative who uses a wheelchair?
Yes. The design can include a level approach and threshold, turning space in each room, a wet room, wider doors and worktops at a usable height. Where Oxford City Council requires a particular access standard through planning, the design meets it; otherwise it’s your choice how far to go. Input from your relative’s occupational therapist is well worth having.
Other options in Oxford
- Joint venture on your garden plot
- Tandem and landlocked plots
- Planning promotion for your garden plot
- Garage courts and yards
- Bungalows on large plots
- Plot feasibility and design

