- Planning authority
- Manchester City Council
- Postcodes
- M1, M2, M3, M4, M13
- Noon sun, 21 March
- About 37°
- Shadow from a 5 m eaves line
- About 6.8 m
- Planning plan
- Local Plan
- County
- Greater Manchester
Manchester: light, access and policy
Access is where most garden plots stand or fall, in Manchester as anywhere. We measure every possible route in, whether a side drive, a gap left by a garage, a back lane or a shared way, and check its width, the sightlines onto the street, and the bin and emergency routes. Plots differ from one street to the next, so there is no standard answer for homes in M1, M2, M3 and M4. If the way in passes over someone else’s land, the title check shows whether a right of way exists, and Manchester City Council’s highway advice shows what standard the route must meet.
From first call to decision
From first call to a clear answer, feasibility work in Manchester follows a simple order: free appraisal, written quote, measured survey, title and constraints check, access and capacity study, concept designs, and pre-application advice from Manchester City Council where it helps. You get a short report setting out the options, and the choice of what happens next stays with you.
Free plot appraisal
A desktop look at your plot, access, title plan and the planning picture, plus a conversation about what you want. If it looks viable we visit. There’s no cost and no obligation at this stage.
Scope and written quote
If you want to go further, we set out which surveys and checks your plot needs and what they will cost, in writing. Nothing is commissioned until you have agreed the scope and the price.
Survey and constraints check
A measured survey of the plot and its surroundings, then a check of the title, services, trees, flood risk and heritage designations, so the design starts from facts rather than guesses.
Feasibility report and options
A clear yes, no or maybe, the reasons behind it, and the routes open to you: apply for planning, build, sell or partner. You decide what happens next, with no obligation to use us for it.
Worth checking early
- Title problems such as covenants, ransom strips or missing rights of way can take time and money to resolve.
- Pre-application advice is not binding, and the council’s decision on a formal application can still differ.
- A feasibility study can end in a no; finding that out early costs far less than a refused application.
Manchester: questions to ask
How many homes could fit in my garden in Manchester?
That is what a capacity study answers. It tests options against separation distances from neighbours, garden space for each home, parking, bins and access, as well as the policies Manchester City Council applies. For many gardens the answer is one home; larger or combined plots can sometimes take more. We show the options on drawings so you can see why.
What if my Manchester garden plot fails the feasibility check?
Then you know before spending money on a planning application, and you know why. Sometimes a smaller scheme, an annexe, or working with the neighbours next door changes the answer, and we will say if so. If nothing does, you keep the survey and the report for the future. You are under no obligation to us either way.
Do I have to use you for planning after a feasibility study in Manchester?
No. The survey, report and concept designs are yours to use as you choose. You can take the scheme forward with us, through our planning permission or design and build services, or sell or partner on the plot with us, or use another firm. We would rather you made the decision that suits you.
Can I get pre-application advice on a garden plot in Manchester?
Usually, yes. Most councils offer pre-application advice, and many charge a fee for it. Manchester City Council’s website sets out its current arrangements, including how to apply, what to send and how long a response usually takes. We can prepare the information and attend any meeting for you. The advice isn’t binding, but it is a useful test before a full application.
Other options in Manchester
- Planning permission for a garden plot
- Garden plot option agreement
- Sell part of your garden
- Joint venture on your garden plot
- Garage courts and yards
- Tandem and landlocked plots

