- Planning authority
- Cornwall Council
- Postcodes
- PL31
- Noon sun, 21 March
- About 40°
- Shadow from a 5 m eaves line
- About 6.1 m
- Planning plan
- Local Plan
- County
- Cornwall
Before you decide in Bodmin
Overshadowing is a common objection to garden homes, so we answer it with numbers. At noon on 21 March the sun over Bodmin is about 40° above the horizon, and the shadow from a 5 m eaves line reaches about 6.1 m; on 21 December the sun rises to only about 16°.
Using those angles, we model shadows across neighbouring gardens and windows and adjust the height, position or roof shape of the new home until the effect is acceptable. Cornwall Council can then judge the scheme on evidence rather than impressions.
How we’d take it forward in Bodmin
If you already have outline permission or a full permission with conditions for a plot in Bodmin, we can take it from there. We check what still needs approval, prepare reserved matters or condition details, and submit them. Then you can move on to the build with us, sell the plot, or hold it while you decide.
Free plot appraisal
We review the title plan, access, constraints, policy and planning history around your address, then talk it through with you. If the plot looks viable we visit, and tell you plainly whether an application is worth making.
Pre-application advice
Where policy is tight or the plot unusual, we put a draft scheme to the council’s planners first. Their written response shows which issues to fix before you pay the full application fee.
Submit and manage
We complete the forms, ownership certificate, drawings and statements, pay the fee on your behalf and submit. During consultation we answer officers’ questions, respond to consultees and agree amendments where they help.
Decision and next steps
If permission is granted, we explain every condition and what must happen before work starts. If it’s refused, we review the reasons with you and set out the options: amend and resubmit, appeal, or stop.
Worth checking early
- Conditions can add cost and work before building starts, such as approved drainage details, tree protection or a construction management plan.
- Planning is the council’s decision; even a well-prepared application can be refused, and the costs of preparing it aren’t recovered.
- Specialist surveys can be needed at short notice when a consultee raises an issue, adding cost and time.
Your questions, answered for Bodmin
How close to neighbours can a new home in Bodmin be?
It depends on the council’s guidance and the window layout. Many councils use around 21 metres between facing back windows and around 12 to 15 metres between a back window and a blank side wall, but the guide used by Cornwall Council decides. Screening, levels, roof form and window positions can all change what is acceptable.
Who decides planning applications for garden plots in Bodmin?
Cornwall Council decides applications for addresses in Bodmin. Small applications are usually decided by planning officers under delegated powers, and national and council rules set out when one can go to the planning committee instead. The decision is based on the council’s Local Plan, national policy and other material considerations, including neighbours’ and consultees’ comments.
How long will my Bodmin garden plot application take?
The statutory period for a minor application, such as one or a few new homes, is 8 weeks from validation, in both England and Wales. Many take longer, and the council may ask you to agree an extension in writing. If no decision is made in time and no extension is agreed, you can appeal for non-determination.
What documents are needed for a garden plot application in Bodmin?
Cornwall Council publishes a local validation list, as every council does. Typically you need the forms, a location plan with the site and access edged in red, a site plan, floor plans, elevations, an ownership certificate and the fee, plus reports the plot calls for, such as trees, ecology, drainage and access. We prepare to the list for your address.
Other options in Bodmin
- Tandem and landlocked plots
- Planning promotion for your garden plot
- Bungalows on large plots
- Build a home for family in your garden
- Sell part of your garden
- Joint venture on your garden plot

