- Nation
- England
- National planning policy
- NPPF
- Planning authorities
- 1
- County town
- Oakham
Before you start in Rutland
Before a council in Rutland looks at the merits, it checks that the application is valid. That means the correct forms, a location plan with the site and access edged in red, the right ownership certificate, the fee and everything on its local validation list. Missing items stop the clock before it starts. We prepare to the list that applies to your plot so the application is registered promptly and the 8-week statutory period can begin.
Planning authorities covering Rutland include Rutland County Council.
How it works
Free plot appraisal
We review the title plan, access, constraints, policy and planning history around your address, then talk it through with you. If the plot looks viable we visit, and tell you plainly whether an application is worth making.
Surveys and design
A measured survey comes first, followed by the specialist surveys the plot needs, such as trees or ecology. The layout is designed around access, privacy, daylight, parking, bins and garden space for both homes.
Pre-application advice
Where policy is tight or the plot unusual, we put a draft scheme to the council’s planners first. Their written response shows which issues to fix before you pay the full application fee.
Submit and manage
We complete the forms, ownership certificate, drawings and statements, pay the fee on your behalf and submit. During consultation we answer officers’ questions, respond to consultees and agree amendments where they help.
Decision and next steps
If permission is granted, we explain every condition and what must happen before work starts. If it’s refused, we review the reasons with you and set out the options: amend and resubmit, appeal, or stop.
Garden plot planning in towns across Rutland
Questions about garden plot planning in Rutland
What drainage information do Rutland garden plots need?
For a new home, foul drainage must connect to a sewer or a suitable treatment system, and rainwater has to be handled on site. In practice that means a drainage plan the council will want to see. If a public sewer crosses the plot, the water company may also need a build-over agreement, separate from planning.
Do you prepare planning applications for garden plots across Rutland?
Yes. We offer to prepare and manage planning applications for new homes on garden land throughout Rutland, working with whichever council covers your address. The appraisal is free; our fee for the application work is agreed in writing before we start, with the council’s fee and any specialist surveys listed separately.
Is outline or full permission better for Rutland garden plots?
For most garden plots, full permission is the stronger option because privacy, daylight and access can only be judged properly with detailed drawings. Outline may suit an owner who intends to sell and wants a buyer to choose the house design. Where outline is used, we usually fix the access at that stage.
Can neighbours in Rutland combine their gardens?
Yes. Putting two or more adjoining back gardens together can allow one shared access and a better layout than separate plots. Each owner keeps their house. The owners usually sign a collaboration agreement, with an equalisation clause so that value is shared fairly even though only one garden provides the access. Each household should take its own legal advice.

