- Planning authority
- Reading Borough Council
- Postcodes
- RG1, RG4, RG6, RG30, RG31
- Noon sun, 21 March
- About 39°
- Shadow from a 5 m eaves line
- About 6.3 m
- Planning plan
- Local Plan
- County
- Berkshire
The local picture in Reading
Homes on a garage court in Reading usually sit close to neighbouring gardens on several sides. In December the sun at midday gets no higher than about 15°, so a tall building near a boundary can leave those gardens in shade for much of the winter.
Low, carefully placed homes avoid most of that. Mews-style homes with windows facing along the court, or bungalows set back from the boundaries, often answer the overlooking and light questions Reading Borough Council is likely to raise. We test each option against your site before anything is drawn in detail.
From first call to decision
Here’s what happens after you contact us about a garage site in Reading. We look at the title plan, maps and the planning history, then call you to talk through who uses the garages and the lane. If the site looks viable we visit, check access, buildings and neighbours, and send a plain summary of the options, with no obligation.
Free site appraisal
We look at the site on maps, the title plan and the planning history, then talk through who uses it now. If it looks workable we visit. There’s no cost and no obligation.
Rights and title review
We map who has rights over the court and lane, which garages are let and on what terms, and whether any covenants, charges or strips of land you don’t own could block a scheme.
Choose your route
Sell the site outright or subject to planning, grant an option, or keep it and have us design, get planning for and build. Garage tenancies and licences are ended properly before any work starts.
Planning, then sale or build
We prepare and submit the application and the council decides. If you sell, your solicitor handles the transfer. If you build, a written quote follows design and survey, then demolition and construction.
Worth checking early
- A narrow or unadopted lane can restrict the number of homes, or require sprinklers, a turning space or bin collection point.
- Asbestos, contamination and bat surveys add cost and time before demolition can start.
- If garage income stops before a sale or build completes, you lose that income in the meantime.
Your questions, answered for Reading
Will you buy my garages in Reading with tenants in them?
Possibly. Any purchase is subject to survey, title and contract, with or without planning in place. Existing tenancies and licences must be brought to an end properly under their own terms, and when that happens forms part of the agreed deal. Get legal advice before any notice is served.
Who has the final say on a Reading garage court scheme?
Reading Borough Council, as the local planning authority. Officers weigh the scheme against the council’s Local Plan and national policy, plus highways and design guidance, after hearing from neighbours and the highway authority. We put the application together and answer the officer’s questions, yet the verdict is never ours to give.
Can you build homes on my yard in Reading if I keep it?
Yes. You keep ownership while we handle the lot: surveys, demolition of the old buildings, design, the planning application, construction and the structural warranty that buyers’ lenders tend to need. A written quote is given once design and survey are complete; guide prices before then are only guides.
Do I need an asbestos survey for garages in Reading?
Yes, before demolition. Health and Safety Executive guidance says a refurbishment and demolition survey must find asbestos before structural work begins. Older garage roofs are often asbestos cement sheeting. Specialists carry out the survey and removal, and we build both into the plan.
Other options in Reading
- Build a home for family in your garden
- Plot feasibility and design
- Planning permission for a garden plot
- Combine gardens with your neighbours
- Planning promotion for your garden plot
- Sell part of your garden

