- Planning authority
- Lancaster City Council
- Postcodes
- LA4
- Noon sun, 21 March
- About 36°
- Shadow from a 5 m eaves line
- About 6.9 m
- Planning plan
- Local Plan
- County
- Lancashire
Before you decide in Morecambe
Garage courts are usually hemmed in by back gardens, so light becomes a real test. Take 21 March: at noon, Morecambe gets sun from about 36° up, which means a wall with 5 m eaves shades a strip of ground about 6.9 m deep behind it. Midwinter is harsher still, with the sun peaking at around 12°.
That explains why low homes, often single-storey or with rooms tucked into the roof, suit so many courts. We plot the shadows for your actual site and shape the buildings so surrounding gardens hold on to their light.
How we’d take it forward in Morecambe
From here the pace is yours. A sale only proceeds once heads of terms are in writing and you’re happy with them; a build only proceeds once surveys, design and a written quote are in front of you. Garage tenancies are brought to an end under their own terms, on legal advice. Lancaster City Council then consults neighbours on the application and makes the decision.
Free site appraisal
We look at the site on maps, the title plan and the planning history, then talk through who uses it now. If it looks workable we visit. There’s no cost and no obligation.
Rights and title review
We map who has rights over the court and lane, which garages are let and on what terms, and whether any covenants, charges or strips of land you don’t own could block a scheme.
Site checks and layout
We look at the access lane, the buildings, likely asbestos and contamination, drains and neighbours’ windows, then sketch what could realistically fit, from one home to a small group, or nothing at all.
Choose your route
Sell the site outright or subject to planning, grant an option, or keep it and have us design, get planning for and build. Garage tenancies and licences are ended properly before any work starts.
Worth checking early
- Asbestos, contamination and bat surveys add cost and time before demolition can start.
- Rights of way over the court or lane can limit what you can build, and some arise from long use rather than the title.
- If garage income stops before a sale or build completes, you lose that income in the meantime.
Your questions, answered for Morecambe
What does it cost to have my Morecambe garage site assessed?
Nothing. Our assessment is free, with no obligation. We review the title, maps and planning history and speak to you before deciding whether a visit is worthwhile. You’re only committed after choosing a route and agreeing terms set out in writing.
Can neighbours in Morecambe block a garage court scheme?
Neighbours are consulted and can object, and those with a legal right of way over the court have rights the scheme must respect. Objections alone don’t decide the outcome. We map every right first and design to keep routes open where they are needed.
Is the lane to my Morecambe garages wide enough?
It depends on the lane, the number of homes and local highway standards. The council will look at width, visibility at the street and the effect on neighbours. Fire and bin access matter too. A narrow lane may limit the number of homes rather than ruling the site out.
Can you build homes on my yard in Morecambe if I keep it?
Yes. You keep ownership while we handle the lot: surveys, demolition of the old buildings, design, the planning application, construction and the structural warranty that buyers’ lenders tend to need. A written quote is given once design and survey are complete; guide prices before then are only guides.
Other options in Morecambe
- Planning permission for a garden plot
- Planning promotion for your garden plot
- Build a new home in your garden
- Garden plot option agreement
- Tandem and landlocked plots
- Corner and side plots

