- Planning authority
- Somerset Council
- Postcodes
- BA11
- Noon sun, 21 March
- About 39°
- Shadow from a 5 m eaves line
- About 6.2 m
- Planning plan
- Local Plan
- County
- Somerset
What the council will look at in Frome
Garage courts are usually hemmed in by back gardens, so light becomes a real test. Take 21 March: at noon, Frome gets sun from about 39° up, which means a wall with 5 m eaves shades a strip of ground about 6.2 m deep behind it. Midwinter is harsher still, with the sun peaking at around 15°.
That explains why low homes, often single-storey or with rooms tucked into the roof, suit so many courts. We plot the shadows for your actual site and shape the buildings so surrounding gardens hold on to their light.
From first call to decision
A garage enquiry from Frome can open with a phone call and a handful of photos showing the court, the lane and the roofs. We then run a desktop check and visit if the site deserves it. Sellers move on to heads of terms, handled by their solicitor; owners who want to build move on to surveys, design and a written quote.
Free site appraisal
We look at the site on maps, the title plan and the planning history, then talk through who uses it now. If it looks workable we visit. There’s no cost and no obligation.
Rights and title review
We map who has rights over the court and lane, which garages are let and on what terms, and whether any covenants, charges or strips of land you don’t own could block a scheme.
Site checks and layout
We look at the access lane, the buildings, likely asbestos and contamination, drains and neighbours’ windows, then sketch what could realistically fit, from one home to a small group, or nothing at all.
Choose your route
Sell the site outright or subject to planning, grant an option, or keep it and have us design, get planning for and build. Garage tenancies and licences are ended properly before any work starts.
Worth checking early
- Ending garage tenancies or licences takes time, and some tenants may have legal protection; get legal advice before serving notice.
- A narrow or unadopted lane can restrict the number of homes, or require sprinklers, a turning space or bin collection point.
- Asbestos, contamination and bat surveys add cost and time before demolition can start.
Questions about garden plots in Frome
Can I build houses on my garage block in Frome?
Possibly, if the lane works for cars, bins and emergency access, neighbours’ privacy and light are protected, and rights over the site can be dealt with. Homes there need planning permission, which is Somerset Council’s decision. A free appraisal shows whether the site merits going further.
Who has the final say on a Frome garage court scheme?
Somerset Council, as the local planning authority. Officers weigh the scheme against the council’s Local Plan and national policy, plus highways and design guidance, after hearing from neighbours and the highway authority. We put the application together and answer the officer’s questions, yet the verdict is never ours to give.
Is the lane to my Frome garages wide enough?
It depends on the lane, the number of homes and local highway standards. The council will look at width, visibility at the street and the effect on neighbours. Fire and bin access matter too. A narrow lane may limit the number of homes rather than ruling the site out.
What does it cost to have my Frome garage site assessed?
Nothing. Our assessment is free, with no obligation. We review the title, maps and planning history and speak to you before deciding whether a visit is worthwhile. You’re only committed after choosing a route and agreeing terms set out in writing.
Other options in Frome
- Plot feasibility and design
- Joint venture on your garden plot
- Sell part of your garden
- Build a home for family in your garden
- Garden plot option agreement
- Build a new home in your garden

