- Planning authority
- Leeds City Council
- Postcodes
- LS19
- Noon sun, 21 March
- About 36°
- Shadow from a 5 m eaves line
- About 6.8 m
- Planning plan
- Local Plan
- County
- West Yorkshire
What the council will look at in Yeadon
Garage blocks behind homes vary from a few lock-ups off a short drive to long courts serving whole streets, and a site in LS19 could be either. The size of the site, the width of the lane and how many neighbours back onto it decide what could fit, not the number of garages.
Owners just outside Yeadon, in places like Guiseley, Horsforth and Shipley, face the same questions. We look at the lane, the rights over it and the distance to neighbouring windows first, then sketch options from a single home to a small group.
What happens next in Yeadon
Tell us where the garages or yard are in Yeadon and how the land is used now. From there we review Leeds City Council’s policies, past applications close by and the title, looking for rights of way, covenants and charges. If nothing stands in the way, we’ll arrange to meet you on site and walk the lane and the court together.
Free site appraisal
We look at the site on maps, the title plan and the planning history, then talk through who uses it now. If it looks workable we visit. There’s no cost and no obligation.
Rights and title review
We map who has rights over the court and lane, which garages are let and on what terms, and whether any covenants, charges or strips of land you don’t own could block a scheme.
Choose your route
Sell the site outright or subject to planning, grant an option, or keep it and have us design, get planning for and build. Garage tenancies and licences are ended properly before any work starts.
Planning, then sale or build
We prepare and submit the application and the council decides. If you sell, your solicitor handles the transfer. If you build, a written quote follows design and survey, then demolition and construction.
Worth checking early
- Neighbours whose gardens back onto the court are consulted and may object; the council decides.
- If garage income stops before a sale or build completes, you lose that income in the meantime.
- Rights of way over the court or lane can limit what you can build, and some arise from long use rather than the title.
Questions about garden plots in Yeadon
Do I need an asbestos survey for garages in Yeadon?
Yes, before demolition. Health and Safety Executive guidance says a refurbishment and demolition survey must find asbestos before structural work begins. Older garage roofs are often asbestos cement sheeting. Specialists carry out the survey and removal, and we build both into the plan.
Can you build homes on my yard in Yeadon if I keep it?
Yes. You keep ownership while we handle the lot: surveys, demolition of the old buildings, design, the planning application, construction and the structural warranty that buyers’ lenders tend to need. A written quote is given once design and survey are complete; guide prices before then are only guides.
What does it cost to have my Yeadon garage site assessed?
Nothing. Our assessment is free, with no obligation. We review the title, maps and planning history and speak to you before deciding whether a visit is worthwhile. You’re only committed after choosing a route and agreeing terms set out in writing.
Will you buy my garages in Yeadon with tenants in them?
Possibly. Any purchase is subject to survey, title and contract, with or without planning in place. Existing tenancies and licences must be brought to an end properly under their own terms, and when that happens forms part of the agreed deal. Get legal advice before any notice is served.
Other options in Yeadon
- Planning promotion for your garden plot
- Planning permission for a garden plot
- Sell subject to planning
- Large rear gardens
- Plot feasibility and design
- Combine gardens with your neighbours

