- Planning authority
- Lewes District Council
- Postcodes
- BN10
- Noon sun, 21 March
- About 39°
- Shadow from a 5 m eaves line
- About 6.1 m
- Planning plan
- Local Plan
- County
- East Sussex
The local picture in Peacehaven
Overshadowing is often the deciding issue in a long garden. At midday on 21 March the sun in Peacehaven stands about 39° above the horizon, so a typical two-storey eaves line throws a shadow of roughly 6.1 m. In midwinter the noon sun is only about 16° up and shadows stretch around three times as far.
That’s why the gap between a new home and neighbouring gardens matters, and why a lower roof, or a home set further from the boundary, can make a scheme acceptable. We check the shadows on your actual plot rather than relying on rules of thumb.
From first call to decision
Once you’ve had the free appraisal, nothing moves without your say-so. For a sale, terms are agreed in writing before you sign anything. For a build, design and survey come first and the quote follows. In both cases the planning application goes to Lewes District Council, which consults your neighbours before deciding. Small schemes often take a few months from submission, and surveys or design changes can add more.
Free plot appraisal
We look at your garden using maps, the title plan and the planning history around you, then talk it through with you. If it looks workable we arrange a site visit. There’s no cost and no obligation.
Measure and test the layout
We check depth, the width of the way in, levels, trees, drains and what lies behind, then sketch what could realistically fit: one home, two, or nothing worth pursuing, before anyone pays for an application.
Choose your route
You decide whether to sell the plot outright, sell subject to planning, grant an option, team up with neighbours, or keep the land and have us design, get planning for and build a home on it.
Planning application
We prepare the drawings and reports, usually take pre-application advice, and submit. The council consults neighbours and decides. Small schemes often take a few months from submission, longer if surveys or amendments are needed.
Worth checking early
- A shorter garden changes how your own house feels to live in and may affect what it is worth.
- Surveys and drawings cost money before any decision. On a subject-to-planning sale we normally fund them; on a build you do.
- Neighbours are consulted and may object. The council decides, and a carefully designed scheme can still be refused.
Peacehaven: questions to ask
Who decides planning for a home in a Peacehaven back garden?
Lewes District Council decides, using the council’s Local Plan, national policy and any local design guidance. It consults neighbours and other bodies before reaching a decision. We prepare the application and deal with the planning officer, but the outcome is always the council’s call.
Can you build a home for my family in my garden in Peacehaven?
Yes. If you keep the land, we can design the home, apply for planning permission, build it once permission is granted and arrange the structural warranty lenders usually expect. You receive a written quote after design and survey. If the home is for a relative who will share your kitchen and front door, an annexe may suit better.
Can I build a house in my back garden in Peacehaven?
Possibly, if the garden is deep enough, has a safe way in and a new home wouldn’t harm the neighbours or the character of the street. A new separate home always needs planning permission, and Lewes District Council makes the decision. A free appraisal will tell you whether your garden is worth taking further.
Does it cost anything to have my Peacehaven garden looked at?
No. The garden plot appraisal is free and carries no obligation. It starts with a desktop check and a conversation, and we arrange a site visit if your garden looks viable. You only commit to anything once you’ve chosen a route and seen the terms in writing.
Other options in Peacehaven
- Planning permission for a garden plot
- Garage courts and yards
- Plot feasibility and design
- Tandem and landlocked plots
- Garden plot option agreement
- Sell part of your garden

