Tandem and landlocked plots in Amersham

Got land behind your Amersham home but no obvious way to reach it? You’re not alone, and it isn’t always a dead end. The fix might be as simple as confirming an existing right of way covers a new home, or it might mean negotiating with whoever owns a strip in between.

We start with the access, because it decides everything else. A free appraisal looks at ownership, rights, width and the route to the road, and only then at what Buckinghamshire Council is likely to accept on layout, privacy and parking. There is no cost and no obligation.

Narrow gravel drive running between two brick houses to an open gate and a garden plot behind
Planning authority
Buckinghamshire Council
Postcodes
HP6, HP7
Noon sun, 21 March
About 38°
Shadow from a 5 m eaves line
About 6.3 m
Planning plan
Local Plan
County
Buckinghamshire

Before you decide in Amersham

Back lanes behind homes in HP6 and HP7 can be public roads, private tracks or a mix of both. If the lane is maintained at public expense, it will be on the list of streets the highway authority keeps, which anyone can check. If it’s private, you need a right to use it with vehicles for a new home.

We check that before planning anything, then look at how Buckinghamshire Council is likely to judge a home reached from the back rather than past the front.

Section showing noon sun and shadows in Amersham: about 38 degrees on 21 March and 15 degrees on 21 December21 m21 Mar, noon: sun 38°, shadow 6.3 m21 Dec, noon: sun 15°, shadow 18.8 mExistingNew home
Noon sun in Amersham on 21 March sits about 38° above the horizon, so a typical two-storey eaves line (about 5 m) throws a shadow of roughly 6.3 m. In December the sun is only about 15° up and shadows stretch much further. Drawn for a garden facing north, where it matters most.

How we’d take it forward in Amersham

We take a Amersham plot with tricky access forward in three stages. First the legal access, confirmed with your solicitor. Then a layout that answers the questions Buckinghamshire Council asks about tandem and backland homes. Then the route you chose, whether that’s a sale, an option or a build. You can stop at any stage before signing.

  1. Free plot appraisal

    We start with the access, not the plot: title plans, rights of way, the width on the ground and the route to the road. It’s a desktop check and a conversation, with a site visit if it looks viable, at no cost.

  2. Title and access check

    With your solicitor we confirm who owns every strip between the plot and the road, what rights already exist and whether they cover a new home. Any ransom strip or missing right shows up at this stage.

  3. Planning application

    We design a layout that answers the access, privacy and neighbour questions councils ask about tandem and backland plots, then apply. The council consults neighbours and decides, and the decision is always the council’s.

  4. Sale or build

    Depending on the route you chose, the sale completes through a transfer of part, or you keep the land and we give a written quote for building the new home after design and survey.

Worth checking early

  • Access is usually the deciding factor on these plots, so a large plot with a poor way in may not be a building plot at all.
  • Long or narrow drives can mean extra cost for sprinklers, passing places, lighting or a bin collection point.
  • Buying out a ransom strip or a neighbour’s land costs money and time, and the other owner can say no.

Amersham: questions to ask

Can I get planning permission in Amersham before the access is sorted?

You can apply for planning on land you don’t own, as long as the owners are formally notified. But permission doesn’t give a right to cross anyone’s land. Most of the time it makes sense to agree access terms first, so the permission can actually be used.

How long does sorting access on a Amersham plot usually take?

It varies. Confirming an existing right of way can take a few weeks of solicitor time. Negotiating with a neighbour or a ransom strip owner often takes longer, and depends on how quickly everyone agrees and takes advice. Once we’ve seen the title and the route, we can give you a sensible estimate.

Is a sprinkler system needed for a home at the end of a long drive in Amersham?

It may be. In England, where a fire engine can’t get within 45 metres of all points inside the home, other measures, often sprinklers, may be accepted if building control and the fire service agree. In Wales, every new house needs sprinklers anyway. Building control decides what’s needed for the specific layout.

Can I build behind my house in Amersham if the only way in is my drive?

Possibly. That would be a tandem layout, with the new home behind yours sharing your drive. Buckinghamshire Council will look at the effect of cars passing your house, privacy, garden space and whether it suits the area. Fire and bin access also need checking. The decision is the council’s, and a good design improves the odds.

Other options in Amersham

Tandem and landlocked plots near Amersham

Find out what your garden could become

Free garden plot appraisal. No cost, no obligation, and a straight answer if it won’t work.