- Planning authority
- Chesterfield Borough Council
- Postcodes
- S43
- Noon sun, 21 March
- About 37°
- Shadow from a 5 m eaves line
- About 6.7 m
- Planning plan
- Local Plan
- County
- Derbyshire
What the council will look at in Staveley
A home placed behind another changes the light as well as the traffic. In Staveley the sun peaks at roughly 37° in late March and barely 13° at the winter solstice, so shadows from even a modest building stretch a long way across a garden in the darker months.
That is why many tandem schemes use a single-storey or low-eaves design. It keeps upstairs windows from looking over neighbours and limits shadow. Chesterfield Borough Council decides, and its own guidance on separation distances sets the gaps it expects.
The next steps, locally
We take a Staveley plot with tricky access forward in three stages. First the legal access, confirmed with your solicitor. Then a layout that answers the questions Chesterfield Borough Council asks about tandem and backland homes. Then the route you chose, whether that’s a sale, an option or a build. You can stop at any stage before signing.
Free plot appraisal
We start with the access, not the plot: title plans, rights of way, the width on the ground and the route to the road. It’s a desktop check and a conversation, with a site visit if it looks viable, at no cost.
Title and access check
With your solicitor we confirm who owns every strip between the plot and the road, what rights already exist and whether they cover a new home. Any ransom strip or missing right shows up at this stage.
Planning application
We design a layout that answers the access, privacy and neighbour questions councils ask about tandem and backland plots, then apply. The council consults neighbours and decides, and the decision is always the council’s.
Sale or build
Depending on the route you chose, the sale completes through a transfer of part, or you keep the land and we give a written quote for building the new home after design and survey.
Worth checking early
- Tandem layouts affect the front house’s privacy and quiet, and councils weigh that carefully.
- Planning permission gives no right to cross land you don’t own; the legal access has to be secured separately.
- Buying out a ransom strip or a neighbour’s land costs money and time, and the other owner can say no.
Your questions, answered for Staveley
How long does sorting access on a Staveley plot usually take?
It varies. Confirming an existing right of way can take a few weeks of solicitor time. Negotiating with a neighbour or a ransom strip owner often takes longer, and depends on how quickly everyone agrees and takes advice. Once we’ve seen the title and the route, we can give you a sensible estimate.
Can I get planning permission in Staveley before the access is sorted?
You can apply for planning on land you don’t own, as long as the owners are formally notified. But permission doesn’t give a right to cross anyone’s land. Most of the time it makes sense to agree access terms first, so the permission can actually be used.
Can I build behind my house in Staveley if the only way in is my drive?
Possibly. That would be a tandem layout, with the new home behind yours sharing your drive. Chesterfield Borough Council will look at the effect of cars passing your house, privacy, garden space and whether it suits the area. Fire and bin access also need checking. The decision is the council’s, and a good design improves the odds.
How do I find out if a lane behind my Staveley home is a public road?
The highway authority keeps a list of streets maintained at public expense, and anyone can inspect it free of charge. If the lane isn’t on it, it’s probably private, and you’ll need to know who owns it and whether your title gives a vehicle right of way that would cover a new home.
Other options in Staveley
- Build a home for family in your garden
- Plot feasibility and design
- Large rear gardens
- Combine gardens with your neighbours
- Garage courts and yards
- Sell part of your garden

