- Planning authority
- Salford City Council
- Postcodes
- M5, M6, M7, M50
- Noon sun, 21 March
- About 37°
- Shadow from a 5 m eaves line
- About 6.8 m
- Planning plan
- Local Plan
- County
- Greater Manchester
What the council will look at in Salford
With the sun at about 13° at noon on 21 December, and around 37° in late March, low winter light is a real concern for gardens in Salford. A new home that sits too close or too tall can leave your garden or the one next door in shade for much of the year.
Salford City Council will test this, often against separation distances in its design guidance. Many councils use around 21 metres between facing back windows, though your council’s own guide decides. In a joint venture you see the shading studies before we apply.
How we’d take it forward in Salford
Before any agreement for a Salford garden, we recommend three conversations: one with us about the scheme and structure, one with your own solicitor about security for your land and your exit rights, and one with a tax adviser about how the deal affects you. Then decide in your own time, with no obligation from the appraisal.
Free plot appraisal
We look at your title plan, access, neighbouring homes and the council’s planning policies, then talk through what might be built and whether a joint venture or a simpler sale suits you better.
Development agreement
Your own solicitor and ours turn the heads of terms into a binding agreement. Your solicitor advises on the security that fits, such as the land staying in your name until a set stage or a legal charge.
Planning and build
We fund and manage the planning application, Building Regulations approval and construction, reporting costs and progress to you at agreed points. The council decides the application, and building control checks the work.
Sale or handover
The new homes are sold and the proceeds are split as agreed through the solicitors, or your new home is handed over with its warranty, title and certificates in place.
Worth checking early
- You’ll live next to a building site, and the new home’s design affects your own house and garden.
- We’re a new brand within the S&K Group, so ask for open-book reporting and check every protection in writing.
- A joint venture takes longer than any sale: planning, then building, then selling or handover.
Your questions, answered for Salford
How long does a garden joint venture in Salford usually take?
Longer than a sale, because planning, building and selling all happen before you receive your share. The council’s decision time, the build programme and the market drive the timing. We give you a realistic range for each stage after the appraisal rather than a single promised date.
Will a joint venture in Salford affect my tax?
It may. Sharing in the development and sale of new homes can be taxed differently from a simple sale of garden land, and Stamp Duty Land Tax (SDLT) or VAT may arise depending on the structure. Take advice from a tax adviser on your own position before you commit.
What if the build on my Salford plot runs late?
The development agreement should set long-stop dates and say which delays are acceptable, such as severe weather, and which aren’t. If a deadline passes without good reason, you should be able to end the agreement. Your solicitor will check your land and share are protected if that happens.
Can I do a joint venture on my garden in Salford without paying anything?
In the usual structure, yes. You contribute the land, and we fund design, planning, construction and sale. You may still have your own costs, such as tax or your mortgage lender’s charges, so ask your solicitor and tax adviser to go through them before you sign.
Other options in Salford
- Planning promotion for your garden plot
- Planning permission for a garden plot
- Bungalows on large plots
- Tandem and landlocked plots
- Build a home for family in your garden
- Garden plot option agreement

