- Planning authority
- Elmbridge Borough Council
- Postcodes
- KT7, KT8
- Noon sun, 21 March
- About 39°
- Shadow from a 5 m eaves line
- About 6.3 m
- Planning plan
- Local Plan
- County
- Surrey
What the council will look at in East Molesey
With the sun at about 15° at noon on 21 December, and around 39° in late March, low winter light is a real concern for gardens in East Molesey. A new home that sits too close or too tall can leave your garden or the one next door in shade for much of the year.
Elmbridge Borough Council will test this, often against separation distances in its design guidance. Many councils use around 21 metres between facing back windows, though your council’s own guide decides. In a joint venture you see the shading studies before we apply.
What happens next in East Molesey
Getting started in East Molesey is straightforward. Tell us your address and roughly where the garden runs, and we check your title, access and the planning position from the desk, free of charge. If a joint venture looks realistic, we visit, then explain the structures side by side so you can choose before heads of terms are drafted.
Free plot appraisal
We look at your title plan, access, neighbouring homes and the council’s planning policies, then talk through what might be built and whether a joint venture or a simpler sale suits you better.
Choose the structure
We explain the options side by side: a share of sale proceeds, a share of profit, a home back for your land, or a land payment plus a share. You choose what fits your plans and appetite for risk.
Heads of terms
The key terms go in writing: who funds what, your share or the home you receive, how your land is protected, deadlines, open-book reporting and what happens if planning is refused or the build stalls.
Development agreement
Your own solicitor and ours turn the heads of terms into a binding agreement. Your solicitor advises on the security that fits, such as the land staying in your name until a set stage or a legal charge.
Worth checking early
- Development lenders usually want security over the land, which your solicitor needs to fit around your own protections.
- You’ll live next to a building site, and the new home’s design affects your own house and garden.
- We’re a new brand within the S&K Group, so ask for open-book reporting and check every protection in writing.
Your questions, answered for East Molesey
Can my neighbours join a joint venture in East Molesey?
Yes. Combining adjoining gardens can give a better layout and one shared access. Each owner keeps their house, has their own solicitor and signs up to a collaboration agreement setting out how the result is shared, including fair treatment for the garden that provides the access.
Who decides planning for a joint venture plot in East Molesey?
Elmbridge Borough Council decides, using the council’s Local Plan and national policy in the NPPF. We prepare and fund the application and deal with the council’s questions, but no developer can promise the outcome. If planning is refused, you keep your land, and in the usual structure the planning costs stay with us.
Can I take a new home back instead of cash in East Molesey?
Yes, if the plot can support it. Under a homes-for-land joint venture, one of the finished homes on your plot, or the only one, is transferred to you with its own title and paperwork. The agreement fixes the specification and the timetable.
Can I do a joint venture on my garden in East Molesey without paying anything?
In the usual structure, yes. You contribute the land, and we fund design, planning, construction and sale. You may still have your own costs, such as tax or your mortgage lender’s charges, so ask your solicitor and tax adviser to go through them before you sign.
Other options in East Molesey
- Planning permission for a garden plot
- Plot feasibility and design
- Build a new home in your garden
- Tandem and landlocked plots
- Sell part of your garden
- Planning promotion for your garden plot

