Combine back gardens with your neighbours in Chesterfield

A shared access road is often what makes backland homes possible in Chesterfield. Instead of several narrow drives, one properly designed road with good visibility at the pavement can serve every new home on the combined land, keep cars further from existing windows and give bin lorries and emergency vehicles the room they need.

The household providing that access gives up the most, so an equalisation agreement usually gives them an extra agreed share. Every owner keeps their house and an agreed garden, and the planning application to Chesterfield Borough Council covers the whole site at once rather than plot by plot.

Aerial view of a row of semi-detached houses whose garden ends have been combined into one plot with a new access
Planning authority
Chesterfield Borough Council
Postcodes
S40, S41
Noon sun, 21 March
About 37°
Shadow from a 5 m eaves line
About 6.7 m
Planning plan
Local Plan
County
Derbyshire

Before you decide in Chesterfield

Back gardens in S40 and S41, as anywhere, tend to be divided by fences, hedges and the odd tree, and a combined scheme has to work with all of them. Old boundary hedges may be habitat worth keeping, and mature trees may need an assessment before anything is designed.

We map these features across all the gardens at once, so the layout keeps what matters and the application to Chesterfield Borough Council shows how trees and wildlife have been considered. Doing it across the whole site is simpler and cheaper than doing it garden by garden.

Section showing noon sun and shadows in Chesterfield: about 37 degrees on 21 March and 13 degrees on 21 December21 m21 Mar, noon: sun 37°, shadow 6.7 m21 Dec, noon: sun 13°, shadow 21.1 mExistingNew home
Noon sun in Chesterfield on 21 March sits about 37° above the horizon, so a typical two-storey eaves line (about 5 m) throws a shadow of roughly 6.7 m. In December the sun is only about 13° up and shadows stretch much further. Drawn for a garden facing north, where it matters most.

How we’d take it forward in Chesterfield

The steps for neighbours in Chesterfield are: free appraisal, a meeting with the owners, heads of terms, signed agreements, one planning application, then completion and payment of each owner’s share. Setting up a group takes longer than a single plot, and timing depends on the owners, the lenders and the council, so we give ranges rather than promises.

  1. Free appraisal of the combined land

    We look at all the titles together, the possible access points, the surrounding homes and the planning policies that apply, then explain whether a combined scheme looks realistic and roughly what it might allow.

  2. Meet the neighbours

    We meet the owners together or separately, explain how the scheme and the routes work, and answer questions. We don’t approach your neighbours without your agreement, and nobody is committed at this stage.

  3. Collaboration agreement

    Each owner’s own solicitor reviews the documents, and everyone signs a collaboration agreement alongside the sale, option or promotion agreement. Mortgage lenders are asked to consent early, and the agreements are usually protected on each title.

  4. One planning application

    We prepare and submit a single application for the whole site, with one shared access and a layout designed around all the existing homes. The council decides it, and nobody can promise the result.

Worth checking early

  • Every owner’s mortgage lender, title and covenants have to be dealt with, and one problem can hold up everyone.
  • The owner of the access garden will live beside a shared road, which is why that garden often receives an extra share.
  • Several owners have to agree, so a combined scheme usually takes longer to set up than a single plot.

Your questions, answered for Chesterfield

Who gets more if one garden in Chesterfield provides the access?

Usually the owner of the access garden receives an extra agreed share, because their land makes the scheme possible and their house is most affected by passing cars. The exact method is agreed by everyone in the collaboration agreement before planning starts.

How many neighbours in Chesterfield need to take part?

As few as two can be enough. What matters is that the gardens taking part make a workable site and that one of them provides access to the road. We tell you which gardens are essential and which would simply improve the scheme.

Will Chesterfield Borough Council prefer a combined scheme to single plots in Chesterfield?

It often gives the council a better scheme to assess, with one proper access and more space between homes. But every application is judged on its merits against the council’s Local Plan, and the decision is the council’s. We test the layout against its policies before applying.

Do we each need a solicitor for a combined scheme in Chesterfield?

Yes. Each owner has different interests, a different title and possibly a mortgage, so each needs independent advice. On option and promotion agreements we cover each owner’s reasonable legal fees up to the cap agreed in the heads of terms.

Other options in Chesterfield

Combine neighbours’ gardens near Chesterfield

Find out what your garden could become

Free garden plot appraisal. No cost, no obligation, and a straight answer if it won’t work.