- Planning authority
- Cumberland Council
- Postcodes
- CA13
- Noon sun, 21 March
- About 35°
- Shadow from a 5 m eaves line
- About 7.1 m
- Planning plan
- Local Plan
- County
- Cumbria
How it plays out in Cockermouth
Overshadowing is one of the first things a planning officer checks on a garden scheme. In Cockermouth, the spring equinox sun reaches only about 35° at midday, which means a 5 m eaves line lays down a shadow around 7.1 m long. Come the shortest day, the sun climbs no higher than roughly 12° and the shade stretches far beyond that.
We model those shadows when we design the scheme, because a home that keeps light off your windows and the neighbours’ gardens is easier for Cumberland Council to approve. Sometimes that means a lower roof or a home set further back.
What happens next in Cockermouth
Getting started takes one message: your address and a rough sketch or description of the land you have in mind. From that we pull the title, look at the planning background and ring you with our view. If a conditional sale looks sensible, we come out to see the garden. Heads of terms follow, and your solicitor reviews them before anything is signed.
Free plot appraisal
We check your title, access, planning history and local policy from our desk, then talk it through with you. If a new home looks realistic, we visit the garden and tell you which route we think suits it best.
Heads of terms
We set out the price or price formula, what counts as satisfactory permission, the long-stop date, how any planning costs are treated and who pays which fees. You see all of it before instructing a solicitor.
Planning application
We commission the surveys, prepare the drawings, seek pre-application advice where useful and submit the application, normally at our cost. You see the plans before they go in, and the council makes the decision.
Completion, or you keep your land
Once a satisfactory permission is granted and any challenge period has passed, the sale completes within the agreed time and the plot gets its own title. If permission is refused and the contract ends, the land stays yours.
Worth checking early
- Capital Gains Tax timing on a conditional sale can differ from an ordinary sale; take advice from a tax adviser.
- The plot can’t be sold to anyone else while the contract runs, even if another offer comes along.
- Once contracts are exchanged you are committed to sell if a satisfactory permission is granted.
Your questions, answered for Cockermouth
How long might a sale subject to planning take in Cockermouth?
It usually runs for months, sometimes longer. Exchange often takes a few months; surveys and drawings take a few more; and the Planning Portal says most applications are decided within eight weeks of being valid, though garden schemes can take longer. The long-stop date sets the outer limit, agreed with you at the start.
Who decides the planning application on a conditional sale in Cockermouth?
That is Cumberland Council’s decision as the local planning authority, made under the council’s Local Plan and the National Planning Policy Framework (NPPF). We prepare the application, submit it and answer the council’s questions, but the outcome isn’t ours to control. That’s why the contract has a long-stop date and says what happens if permission is refused.
Do I pay for the planning application on my Cockermouth garden plot?
We normally fund the planning application, including surveys and drawings. Any recovery of those costs is agreed in heads of terms before you sign, for example as a deduction from the price at completion. You see the full position before instructing a solicitor, so there are no surprises later.
What if I want to sell my Cockermouth house during a conditional sale?
Tell us as early as you can. The conditional contract is noted on your title, so your house buyer’s solicitor will see it. The two sales can usually be arranged together, but the order matters for the legal work and possibly for Capital Gains Tax, so take advice from a tax adviser too.
Other options in Cockermouth
- Garage courts and yards
- Planning promotion for your garden plot
- Build a home for family in your garden
- Large rear gardens
- Build a new home in your garden
- Tandem and landlocked plots

