Sell your garden plot subject to planning in Ashton-in-Makerfield

Selling your garden plot in Ashton-in-Makerfield subject to planning means agreeing the price now and completing only once permission is granted. Contracts are exchanged at the start, so both sides are committed, but the plot stays in your name until the condition is met. If Wigan Council refuses and the contract ends, you keep your land.

We normally fund the planning application, with any cost recovery agreed in heads of terms before you sign. That lets you benefit from a price informed by planning without paying for drawings, surveys or fees yourself. Our free appraisal tells you whether the plot looks right for it.

Site plan and house elevation drawings on a kitchen table with the back garden beyond the window
Planning authority
Wigan Council
Postcodes
WN4
Noon sun, 21 March
About 37°
Shadow from a 5 m eaves line
About 6.8 m
Planning plan
Local Plan
County
Greater Manchester

Before you decide in Ashton-in-Makerfield

On a conditional sale, the contract defines what kind of permission triggers completion. In Ashton-in-Makerfield, that definition has to reflect what Wigan Council is likely to ask for: access standards, parking, perhaps biodiversity net gain rules, and possibly a contribution or the Community Infrastructure Levy if the council charges it.

Getting this right protects both sides. Set too tightly, a sound permission might not count; too loosely, you could be held to a sale on terms nobody expected. We draft it around the council’s Local Plan and explain every limb of it before you sign.

Section showing noon sun and shadows in Ashton-in-Makerfield: about 37 degrees on 21 March and 13 degrees on 21 December21 m21 Mar, noon: sun 37°, shadow 6.8 m21 Dec, noon: sun 13°, shadow 21.5 mExistingNew home
This section is worked out for the latitude of Ashton-in-Makerfield: around 37° of sun at midday in late March and about 13° at midwinter. It shows why the gap between your house and a new home behind it is about light as well as privacy. Garden assumed to face north.

How we’d take it forward in Ashton-in-Makerfield

Here is what to expect in Ashton-in-Makerfield. First a phone call, then a desk check of the title and the council’s Local Plan, then a visit if the plot looks promising. If we both want to go ahead, heads of terms set out what we would agree, without obligation, before solicitors draft the conditional contract. The appraisal costs nothing.

  1. Free plot appraisal

    We check your title, access, planning history and local policy from our desk, then talk it through with you. If a new home looks realistic, we visit the garden and tell you which route we think suits it best.

  2. Heads of terms

    We set out the price or price formula, what counts as satisfactory permission, the long-stop date, how any planning costs are treated and who pays which fees. You see all of it before instructing a solicitor.

  3. Exchange of conditional contracts

    Both solicitors agree the contract and the plan of the plot. On exchange, both sides are bound, subject to the planning condition, and our contract is noted on your title so the plot can’t be sold elsewhere.

  4. Completion, or you keep your land

    Once a satisfactory permission is granted and any challenge period has passed, the sale completes within the agreed time and the plot gets its own title. If permission is refused and the contract ends, the land stays yours.

Worth checking early

  • You wait for a planning decision, and possibly an appeal, before you are paid.
  • Once contracts are exchanged you are committed to sell if a satisfactory permission is granted.
  • The plot can’t be sold to anyone else while the contract runs, even if another offer comes along.

Questions about garden plots in Ashton-in-Makerfield

Do I keep my garden in Ashton-in-Makerfield if planning is refused?

Yes. Nothing is transferred until a satisfactory permission is granted, so a refusal leaves the land in your ownership. Depending on the contract, we may revise the scheme and reapply, or appeal, before the long-stop date. If that doesn’t succeed, the contract ends and our notice comes off your title.

How long might a sale subject to planning take in Ashton-in-Makerfield?

It usually runs for months, sometimes longer. Exchange often takes a few months; surveys and drawings take a few more; and the Planning Portal says most applications are decided within eight weeks of being valid, though garden schemes can take longer. The long-stop date sets the outer limit, agreed with you at the start.

Is a sale subject to planning in Ashton-in-Makerfield better than an option?

It depends on the plot. A conditional sale binds both sides from exchange and suits a single plot with a clear scheme. An option gives us a right to buy rather than an obligation, and suits plots where the outcome is less certain or the timescale is longer. We’ll recommend one after the appraisal.

What if I want to sell my Ashton-in-Makerfield house during a conditional sale?

Tell us as early as you can. The conditional contract is noted on your title, so your house buyer’s solicitor will see it. The two sales can usually be arranged together, but the order matters for the legal work and possibly for Capital Gains Tax, so take advice from a tax adviser too.

Other options in Ashton-in-Makerfield

Subject to planning near Ashton-in-Makerfield

Find out what your garden could become

Free garden plot appraisal. No cost, no obligation, and a straight answer if it won’t work.