Sell your garden plot subject to planning in Gateshead

Why not simply apply for planning on your Gateshead garden first and sell afterwards? You can, but it means paying for surveys, drawings and fees yourself, with no buyer committed while you wait. On a sale subject to planning, we do that work and normally carry the cost, and the price is fixed before the council decides.

You still get a say. You see the drawings before submission, and the contract can fix points that matter to you, such as where windows face, how high the new home can be, or who builds the new boundary fence.

Site plan and house elevation drawings on a kitchen table with the back garden beyond the window
Planning authority
Gateshead Council
Postcodes
NE8, NE9, NE10, NE11
Noon sun, 21 March
About 35°
Shadow from a 5 m eaves line
About 7.1 m
Planning plan
Local Plan
County
Tyne and Wear

What the council will look at in Gateshead

Overshadowing is one of the first things a planning officer checks on a garden scheme. In Gateshead, the spring equinox sun reaches only about 35° at midday, which means a 5 m eaves line lays down a shadow around 7.1 m long. Come the shortest day, the sun climbs no higher than roughly 12° and the shade stretches far beyond that.

We model those shadows when we design the scheme, because a home that keeps light off your windows and the neighbours’ gardens is easier for Gateshead Council to approve. Sometimes that means a lower roof or a home set further back.

Section showing noon sun and shadows in Gateshead: about 35 degrees on 21 March and 12 degrees on 21 December21 m21 Mar, noon: sun 35°, shadow 7.1 m21 Dec, noon: sun 12°, shadow 24.4 mExistingNew home
This section is worked out for the latitude of Gateshead: around 35° of sun at midday in late March and about 12° at midwinter. It shows why the gap between your house and a new home behind it is about light as well as privacy. Garden assumed to face north.

What happens next in Gateshead

After you get in touch about a garden in Gateshead, we run the free appraisal and explain which route we would recommend. If it is a sale subject to planning, we draft heads of terms covering the price, the scheme, the long-stop date and costs. Once your solicitor is happy and contracts are exchanged, we begin the planning work.

  1. Free plot appraisal

    We check your title, access, planning history and local policy from our desk, then talk it through with you. If a new home looks realistic, we visit the garden and tell you which route we think suits it best.

  2. Heads of terms

    We set out the price or price formula, what counts as satisfactory permission, the long-stop date, how any planning costs are treated and who pays which fees. You see all of it before instructing a solicitor.

  3. Exchange of conditional contracts

    Both solicitors agree the contract and the plan of the plot. On exchange, both sides are bound, subject to the planning condition, and our contract is noted on your title so the plot can’t be sold elsewhere.

  4. Planning application

    We commission the surveys, prepare the drawings, seek pre-application advice where useful and submit the application, normally at our cost. You see the plans before they go in, and the council makes the decision.

Worth checking early

  • The plot can’t be sold to anyone else while the contract runs, even if another offer comes along.
  • The definition of satisfactory permission and the long-stop date decide how certain the sale really is; read both closely.
  • Once contracts are exchanged you are committed to sell if a satisfactory permission is granted.

Questions about garden plots in Gateshead

Do I keep my garden in Gateshead if planning is refused?

Yes. Nothing is transferred until a satisfactory permission is granted, so a refusal leaves the land in your ownership. Depending on the contract, we may revise the scheme and reapply, or appeal, before the long-stop date. If that doesn’t succeed, the contract ends and our notice comes off your title.

What if I want to sell my Gateshead house during a conditional sale?

Tell us as early as you can. The conditional contract is noted on your title, so your house buyer’s solicitor will see it. The two sales can usually be arranged together, but the order matters for the legal work and possibly for Capital Gains Tax, so take advice from a tax adviser too.

How long might a sale subject to planning take in Gateshead?

It usually runs for months, sometimes longer. Exchange often takes a few months; surveys and drawings take a few more; and the Planning Portal says most applications are decided within eight weeks of being valid, though garden schemes can take longer. The long-stop date sets the outer limit, agreed with you at the start.

Who decides the planning application on a conditional sale in Gateshead?

That is Gateshead Council’s decision as the local planning authority, made under the council’s Local Plan and the National Planning Policy Framework (NPPF). We prepare the application, submit it and answer the council’s questions, but the outcome isn’t ours to control. That’s why the contract has a long-stop date and says what happens if permission is refused.

Other options in Gateshead

Subject to planning near Gateshead

Find out what your garden could become

Free garden plot appraisal. No cost, no obligation, and a straight answer if it won’t work.