- Planning authority
- Wiltshire Council
- Postcodes
- BA14
- Noon sun, 21 March
- About 39°
- Shadow from a 5 m eaves line
- About 6.2 m
- Planning plan
- Local Plan
- County
- Wiltshire
The local picture in Trowbridge
Overshadowing is one of the first things a planning officer checks on a garden scheme. In Trowbridge, the spring equinox sun reaches only about 39° at midday, which means a 5 m eaves line lays down a shadow around 6.2 m long. Come the shortest day, the sun climbs no higher than roughly 15° and the shade stretches far beyond that.
We model those shadows when we design the scheme, because a home that keeps light off your windows and the neighbours’ gardens is easier for Wiltshire Council to approve. Sometimes that means a lower roof or a home set further back.
The next steps, locally
From first enquiry to exchange of contracts usually takes a few months, set mainly by the solicitors and any title questions. The planning stage then runs on its own timetable, depending on surveys and on Wiltshire Council. We keep you updated throughout, share the drawings before submission and tell you as soon as a decision is issued.
Free plot appraisal
We check your title, access, planning history and local policy from our desk, then talk it through with you. If a new home looks realistic, we visit the garden and tell you which route we think suits it best.
Exchange of conditional contracts
Both solicitors agree the contract and the plan of the plot. On exchange, both sides are bound, subject to the planning condition, and our contract is noted on your title so the plot can’t be sold elsewhere.
Planning application
We commission the surveys, prepare the drawings, seek pre-application advice where useful and submit the application, normally at our cost. You see the plans before they go in, and the council makes the decision.
Completion, or you keep your land
Once a satisfactory permission is granted and any challenge period has passed, the sale completes within the agreed time and the plot gets its own title. If permission is refused and the contract ends, the land stays yours.
Worth checking early
- The definition of satisfactory permission and the long-stop date decide how certain the sale really is; read both closely.
- You wait for a planning decision, and possibly an appeal, before you are paid.
- Once contracts are exchanged you are committed to sell if a satisfactory permission is granted.
Questions about garden plots in Trowbridge
Do I keep my garden in Trowbridge if planning is refused?
Yes. Nothing is transferred until a satisfactory permission is granted, so a refusal leaves the land in your ownership. Depending on the contract, we may revise the scheme and reapply, or appeal, before the long-stop date. If that doesn’t succeed, the contract ends and our notice comes off your title.
Will my neighbours in Trowbridge be told about the application?
Yes. Wiltshire Council publicises applications through letters to neighbours, a site notice, or both, depending on its practice. Neighbours can comment, and the council weighs their views against planning policy. You can choose whether to speak to adjoining owners before the application goes in, and we’ll fit in with what you prefer.
Who decides the planning application on a conditional sale in Trowbridge?
That is Wiltshire Council’s decision as the local planning authority, made under the council’s Local Plan and the National Planning Policy Framework (NPPF). We prepare the application, submit it and answer the council’s questions, but the outcome isn’t ours to control. That’s why the contract has a long-stop date and says what happens if permission is refused.
Do I pay for the planning application on my Trowbridge garden plot?
We normally fund the planning application, including surveys and drawings. Any recovery of those costs is agreed in heads of terms before you sign, for example as a deduction from the price at completion. You see the full position before instructing a solicitor, so there are no surprises later.
Other options in Trowbridge
- Planning permission for a garden plot
- Plot feasibility and design
- Joint venture on your garden plot
- Large rear gardens
- Planning promotion for your garden plot
- Bungalows on large plots

