Build a new home in your garden in Truro

A new home in your Truro garden can be built to sell, to let or for someone in the family, and the right design differs for each. A home for sale needs its own title, a structural warranty for buyers’ lenders and a layout with wide appeal. A family home might put level access or a shared garden gate first.

We talk that through at the start, because it changes the size, the specification and the legal set-up. From there we take the plot through design, planning, approvals and construction, handing over a finished home with its certificates and warranty documents.

Timber-frame house under construction with scaffolding at the bottom of a back garden, seen from the patio
Planning authority
Cornwall Council
Postcodes
TR1
Noon sun, 21 March
About 40°
Shadow from a 5 m eaves line
About 6.0 m
Planning plan
Local Plan
County
Cornwall

What shapes a plot in Truro

In Truro, applications for a new home in a garden are decided by Cornwall Council, which weighs them against the council’s Local Plan and national policy. Officers look at access, privacy, daylight, parking, bins, drainage and how much garden is left for each house, and neighbours can comment during consultation.

We read the local policies and any design guidance before drawing a line, and check the planning history of nearby plots for decisions that show how the council has applied them. If the policy picture is uncertain, pre-application advice lets us test the scheme with officers before the formal application goes in.

Section showing noon sun and shadows in Truro: about 40 degrees on 21 March and 16 degrees on 21 December21 m21 Mar, noon: sun 40°, shadow 6.0 m21 Dec, noon: sun 16°, shadow 17.1 mExistingNew home
Noon sun in Truro on 21 March sits about 40° above the horizon, so a typical two-storey eaves line (about 5 m) throws a shadow of roughly 6.0 m. In December the sun is only about 16° up and shadows stretch much further. Drawn for a garden facing north, where it matters most.

What happens next in Truro

From appraisal to a decision from Cornwall Council, each step in Truro is agreed before it starts. After the site visit we quote for survey and design; after design we prepare the application; after permission we deal with conditions and technical approvals and give you a written build quote. Each stage is a separate decision for you, with its cost set out first.

  1. Free plot appraisal

    We check the title plan, access, constraints and planning policy from our desk, talk the plot through with you, and visit if it looks viable. There’s no cost and no obligation.

  2. Survey and design

    A measured survey records levels, boundaries, trees and neighbouring windows. We then design a layout and house that suit the plot, the street and your budget, and decide whether pre-application advice is worth seeking.

  3. Planning and approvals

    We submit the planning application and manage it to a decision, then deal with conditions, Building Regulations approval, the structural warranty, any build-over agreement and the new utility connections.

  4. Handover

    You receive the completion certificate, warranty documents, Energy Performance Certificate, manuals and utility details, so the new home is ready to move into, let or put on the market.

Worth checking early

  • Building and selling a new home can change your tax position compared with selling only your house; take advice from a tax adviser first.
  • A build next door means months of noise, deliveries and contractors near your home; good planning reduces the disruption but doesn’t remove it.
  • Your own garden gets smaller and the new home will be visible from your house, so screening and separation matter for both homes.

Truro: questions to ask

Can I build a house in my garden in Truro and keep the land?

Yes. On our design and build route you remain the owner while we design the home, apply to Cornwall Council for planning, deal with Building Regulations and build it. The finished house can be sold, let or kept for family. Whether your plot can take a house depends on access, space, neighbours and local policy, and the decision rests with the council.

Do you visit gardens in Truro before giving advice?

We start with a desk review of the title plan, access, constraints and planning policy, then talk the plot through with you. If it looks viable, we arrange a site visit to see the access, levels, trees and neighbouring windows for ourselves. The appraisal is free and carries no obligation.

How long does planning take for a new home in a Truro garden?

The statutory period for deciding a minor application, such as a single new home, is 8 weeks from the date the council receives a valid application, in both England and Wales. In practice many applications take longer, and the council may ask you to agree an extension in writing. Surveys and design before submission add time, and conditions may need approving afterwards.

Do new homes in Truro need a structural warranty?

If the house will ever be sold or mortgaged, in practice yes. Mortgage lenders usually expect a 10-year structural warranty on a new home, though some accept an architect’s or surveyor’s certificate, and a warranty provider inspects the work at stages during the build, so it has to be in place before construction starts. Building control approval is separate and also required; a buyer’s solicitor will ask for both.

Other options in Truro

Build in your garden near Truro

Find out what your garden could become

Free garden plot appraisal. No cost, no obligation, and a straight answer if it won’t work.