Build a new home in your garden in Hove

If you own a house in Hove with a long or wide garden, you don’t have to sell the land to benefit from it. We can design a separate new home for the plot, apply to Brighton and Hove City Council for planning permission, and build it while you carry on living next door.

When it’s finished, the house is yours to sell, let or keep for family. As a new name in the S&K Group we don’t trade on past jobs; every project starts the same way: a free, no-obligation appraisal of your garden, then a measured survey and design, then a written quote once the real costs are known.

Timber-frame house under construction with scaffolding at the bottom of a back garden, seen from the patio
Planning authority
Brighton and Hove City Council
Postcodes
BN3, BN41
Noon sun, 21 March
About 39°
Shadow from a 5 m eaves line
About 6.1 m
Planning plan
Local Plan
County
East Sussex

Before you decide in Hove

We cover gardens in Hove and nearby places such as Brighton, Shoreham-by-Sea and Lancing, with the same process wherever you are: a free desktop appraisal, a visit if the plot looks viable, then survey and design.

Some of those places may fall under a different council from Brighton and Hove City Council, and each local planning authority has its own design guidance, validation list and pre-application service. We confirm which authority covers your address at the start, so the application is prepared for the right requirements first time and avoids delays at validation.

Section showing noon sun and shadows in Hove: about 39 degrees on 21 March and 16 degrees on 21 December21 m21 Mar, noon: sun 39°, shadow 6.1 m21 Dec, noon: sun 16°, shadow 17.8 mExistingNew home
This section is worked out for the latitude of Hove: around 39° of sun at midday in late March and about 16° at midwinter. It shows why the gap between your house and a new home behind it is about light as well as privacy. Garden assumed to face north.

How we’d take it forward in Hove

Getting started in Hove takes one step from you: send your address and a few photos of the garden, or call us. We check the title plan, access and planning constraints from our desk, then talk the plot through. If it looks viable we arrange a visit, discuss whether you want to sell, let or keep the new home, and set out the survey and design stage in writing before you commit.

  1. Free plot appraisal

    We check the title plan, access, constraints and planning policy from our desk, talk the plot through with you, and visit if it looks viable. There’s no cost and no obligation.

  2. Survey and design

    A measured survey records levels, boundaries, trees and neighbouring windows. We then design a layout and house that suit the plot, the street and your budget, and decide whether pre-application advice is worth seeking.

  3. Planning and approvals

    We submit the planning application and manage it to a decision, then deal with conditions, Building Regulations approval, the structural warranty, any build-over agreement and the new utility connections.

  4. Handover

    You receive the completion certificate, warranty documents, Energy Performance Certificate, manuals and utility details, so the new home is ready to move into, let or put on the market.

Worth checking early

  • You fund the build and carry the cost risk; ground conditions, sewer diversions or supply upgrades found later can move the price.
  • Building and selling a new home can change your tax position compared with selling only your house; take advice from a tax adviser first.
  • Planning can be refused, and money spent on surveys, design and the application isn’t recovered if it is — which is why we start with an appraisal.

Hove: questions to ask

Can I build a house in my Hove garden and then sell it?

Yes. You keep the land while the home is built, then sell the finished house. Before building starts, the plot should be given its own title through a transfer of part at HM Land Registry, and if your house is mortgaged your lender must agree to release the plot. Selling a home you’ve built can change your tax position, so take advice from a tax adviser first.

How long does planning take for a new home in a Hove garden?

The statutory period for deciding a minor application, such as a single new home, is 8 weeks from the date the council receives a valid application, in both England and Wales. In practice many applications take longer, and the council may ask you to agree an extension in writing. Surveys and design before submission add time, and conditions may need approving afterwards.

Will I pay Community Infrastructure Levy on a new home in Hove?

Only if Brighton and Hove City Council has adopted a Community Infrastructure Levy charging schedule; not every council has. Where it applies, it can be charged on a new home of any size. A self-build exemption exists for people building a home to live in, but it must be claimed before work starts, so we check the position at design stage.

How close can a new house be to my own in Hove?

There’s no single national distance. Many councils use separation guides of around 21 metres between facing back windows and around 12 to 15 metres between a back window and a blank side wall, but the guidance used by Brighton and Hove City Council decides. Window positions, ground levels, roof shape and screening all affect what is acceptable, which is why we survey before we design.

Other options in Hove

Build in your garden near Hove

Find out what your garden could become

Free garden plot appraisal. No cost, no obligation, and a straight answer if it won’t work.