Build a new home in your garden in Lewes

Building a second home behind your own in Lewes is a construction project with one unusual feature: you live beside the site from the first spade to the last coat of paint. That shapes how we plan it, from the fence that separates your garden on day one to where deliveries park.

The route covers everything between an idea and a finished house. We survey and design, prepare and submit the planning application, arrange Building Regulations approval and the structural warranty, organise new water, drainage and electricity connections, and then build. You keep ownership of the land throughout.

Timber-frame house under construction with scaffolding at the bottom of a back garden, seen from the patio
Planning authority
South Downs National Park Authority
Postcodes
BN7
Noon sun, 21 March
About 39°
Shadow from a 5 m eaves line
About 6.1 m
Planning plan
Local Plan
County
East Sussex

Before you decide in Lewes

In Lewes, applications for a new home in a garden are decided by South Downs National Park Authority, which weighs them against the council’s Local Plan and national policy. Officers look at access, privacy, daylight, parking, bins, drainage and how much garden is left for each house, and neighbours can comment during consultation.

We read the local policies and any design guidance before drawing a line, and check the planning history of nearby plots for decisions that show how the council has applied them. If the policy picture is uncertain, pre-application advice lets us test the scheme with officers before the formal application goes in.

Section showing noon sun and shadows in Lewes: about 39 degrees on 21 March and 16 degrees on 21 December21 m21 Mar, noon: sun 39°, shadow 6.1 m21 Dec, noon: sun 16°, shadow 17.8 mExistingNew home
Noon sun in Lewes on 21 March sits about 39° above the horizon, so a typical two-storey eaves line (about 5 m) throws a shadow of roughly 6.1 m. In December the sun is only about 16° up and shadows stretch much further. Drawn for a garden facing north, where it matters most.

What happens next in Lewes

From appraisal to a decision from South Downs National Park Authority, each step in Lewes is agreed before it starts. After the site visit we quote for survey and design; after design we prepare the application; after permission we deal with conditions and technical approvals and give you a written build quote. Each stage is a separate decision for you, with its cost set out first.

  1. Free plot appraisal

    We check the title plan, access, constraints and planning policy from our desk, talk the plot through with you, and visit if it looks viable. There’s no cost and no obligation.

  2. Planning and approvals

    We submit the planning application and manage it to a decision, then deal with conditions, Building Regulations approval, the structural warranty, any build-over agreement and the new utility connections.

  3. Written quote and build

    Once design and survey are complete you get a written quote. The build runs in stages — access and groundworks, foundations, frame and roof, fit-out and external works — with inspections at each key point.

  4. Handover

    You receive the completion certificate, warranty documents, Energy Performance Certificate, manuals and utility details, so the new home is ready to move into, let or put on the market.

Worth checking early

  • Planning can be refused, and money spent on surveys, design and the application isn’t recovered if it is — which is why we start with an appraisal.
  • Building and selling a new home can change your tax position compared with selling only your house; take advice from a tax adviser first.
  • Your own garden gets smaller and the new home will be visible from your house, so screening and separation matter for both homes.

Lewes: questions to ask

Do new homes in Lewes need a structural warranty?

If the house will ever be sold or mortgaged, in practice yes. Mortgage lenders usually expect a 10-year structural warranty on a new home, though some accept an architect’s or surveyor’s certificate, and a warranty provider inspects the work at stages during the build, so it has to be in place before construction starts. Building control approval is separate and also required; a buyer’s solicitor will ask for both.

How long does planning take for a new home in a Lewes garden?

The statutory period for deciding a minor application, such as a single new home, is 8 weeks from the date the council receives a valid application, in both England and Wales. In practice many applications take longer, and the council may ask you to agree an extension in writing. Surveys and design before submission add time, and conditions may need approving afterwards.

How close can a new house be to my own in Lewes?

There’s no single national distance. Many councils use separation guides of around 21 metres between facing back windows and around 12 to 15 metres between a back window and a blank side wall, but the guidance used by South Downs National Park Authority decides. Window positions, ground levels, roof shape and screening all affect what is acceptable, which is why we survey before we design.

Do you visit gardens in Lewes before giving advice?

We start with a desk review of the title plan, access, constraints and planning policy, then talk the plot through with you. If it looks viable, we arrange a site visit to see the access, levels, trees and neighbouring windows for ourselves. The appraisal is free and carries no obligation.

Other options in Lewes

Build in your garden near Lewes

Find out what your garden could become

Free garden plot appraisal. No cost, no obligation, and a straight answer if it won’t work.