Build a new home in your garden in Ashton-in-Makerfield

For a garden in Ashton-in-Makerfield to take a new house, three things have to line up: a safe way in, enough space to keep both homes private and light, and services that can reach the plot at sensible cost. Our free appraisal looks at all three before you spend anything.

If they line up, we move on to a measured survey, design and, where useful, pre-application advice from Wigan Council. Planning permission is the council’s decision, so the design is shaped around the tests its officers apply rather than the largest house the plot could possibly hold.

Timber-frame house under construction with scaffolding at the bottom of a back garden, seen from the patio
Planning authority
Wigan Council
Postcodes
WN4
Noon sun, 21 March
About 37°
Shadow from a 5 m eaves line
About 6.8 m
Planning plan
Local Plan
County
Greater Manchester

Ashton-in-Makerfield: light, access and policy

Daylight is one of the first things Wigan Council will check on a garden house. At midday on 21 March the sun in Ashton-in-Makerfield stands roughly 37° above the horizon, so an eaves line about 5 m high casts a shadow of around 6.8 m. On 21 December the sun is only about 13° up and shadows stretch far longer.

That’s why the gap between your house and the new one, and the height of the new roof, are set by measurement rather than guesswork. A lower eaves line, a hipped roof or a single-storey section can make a real difference to the gardens either side.

Section showing noon sun and shadows in Ashton-in-Makerfield: about 37 degrees on 21 March and 13 degrees on 21 December21 m21 Mar, noon: sun 37°, shadow 6.8 m21 Dec, noon: sun 13°, shadow 21.5 mExistingNew home
Noon sun in Ashton-in-Makerfield on 21 March sits about 37° above the horizon, so a typical two-storey eaves line (about 5 m) throws a shadow of roughly 6.8 m. In December the sun is only about 13° up and shadows stretch much further. Drawn for a garden facing north, where it matters most.

What happens next in Ashton-in-Makerfield

From appraisal to a decision from Wigan Council, each step in Ashton-in-Makerfield is agreed before it starts. After the site visit we quote for survey and design; after design we prepare the application; after permission we deal with conditions and technical approvals and give you a written build quote. Each stage is a separate decision for you, with its cost set out first.

  1. Free plot appraisal

    We check the title plan, access, constraints and planning policy from our desk, talk the plot through with you, and visit if it looks viable. There’s no cost and no obligation.

  2. Planning and approvals

    We submit the planning application and manage it to a decision, then deal with conditions, Building Regulations approval, the structural warranty, any build-over agreement and the new utility connections.

  3. Written quote and build

    Once design and survey are complete you get a written quote. The build runs in stages — access and groundworks, foundations, frame and roof, fit-out and external works — with inspections at each key point.

  4. Handover

    You receive the completion certificate, warranty documents, Energy Performance Certificate, manuals and utility details, so the new home is ready to move into, let or put on the market.

Worth checking early

  • Your own garden gets smaller and the new home will be visible from your house, so screening and separation matter for both homes.
  • Building and selling a new home can change your tax position compared with selling only your house; take advice from a tax adviser first.
  • Planning can be refused, and money spent on surveys, design and the application isn’t recovered if it is — which is why we start with an appraisal.

Your questions, answered for Ashton-in-Makerfield

How long does planning take for a new home in a Ashton-in-Makerfield garden?

The statutory period for deciding a minor application, such as a single new home, is 8 weeks from the date the council receives a valid application, in both England and Wales. In practice many applications take longer, and the council may ask you to agree an extension in writing. Surveys and design before submission add time, and conditions may need approving afterwards.

Who decides planning for a garden house in Ashton-in-Makerfield?

Wigan Council decides applications for addresses in Ashton-in-Makerfield, using the council’s Local Plan, national policy and its own design guidance. Neighbours and consultees such as highways officers can comment, and the decision is made by the council’s planning officers or, where the rules allow, its planning committee. Pre-application advice from the council can help test a scheme before the formal application is submitted.

Do you visit gardens in Ashton-in-Makerfield before giving advice?

We start with a desk review of the title plan, access, constraints and planning policy, then talk the plot through with you. If it looks viable, we arrange a site visit to see the access, levels, trees and neighbouring windows for ourselves. The appraisal is free and carries no obligation.

How close can a new house be to my own in Ashton-in-Makerfield?

There’s no single national distance. Many councils use separation guides of around 21 metres between facing back windows and around 12 to 15 metres between a back window and a blank side wall, but the guidance used by Wigan Council decides. Window positions, ground levels, roof shape and screening all affect what is acceptable, which is why we survey before we design.

Other options in Ashton-in-Makerfield

Build in your garden near Ashton-in-Makerfield

Find out what your garden could become

Free garden plot appraisal. No cost, no obligation, and a straight answer if it won’t work.