Build a new home in your garden in Wigan

A new home in your Wigan garden can be built to sell, to let or for someone in the family, and the right design differs for each. A home for sale needs its own title, a structural warranty for buyers’ lenders and a layout with wide appeal. A family home might put level access or a shared garden gate first.

We talk that through at the start, because it changes the size, the specification and the legal set-up. From there we take the plot through design, planning, approvals and construction, handing over a finished home with its certificates and warranty documents.

Timber-frame house under construction with scaffolding at the bottom of a back garden, seen from the patio
Planning authority
Wigan Council
Postcodes
WN1, WN3, WN6
Noon sun, 21 March
About 36°
Shadow from a 5 m eaves line
About 6.8 m
Planning plan
Local Plan
County
Greater Manchester

The local picture in Wigan

Wherever your house sits across WN1, WN3 and WN6, a new home behind it needs water, power and two kinds of drainage — one for waste, one for rain. We contact the utility providers early, because a long cable run, a sewer at the wrong depth or a public pipe under the lawn can change both the layout and the cost.

Rain from the new roof and drive has to be dealt with on site, and Wigan Council will want to see how. Where a public sewer crosses your garden, the water company may also need a build-over agreement before work starts, so we check sewer records at appraisal stage.

Section showing noon sun and shadows in Wigan: about 36 degrees on 21 March and 13 degrees on 21 December21 m21 Mar, noon: sun 36°, shadow 6.8 m21 Dec, noon: sun 13°, shadow 21.6 mExistingNew home
Noon sun in Wigan on 21 March sits about 36° above the horizon, so a typical two-storey eaves line (about 5 m) throws a shadow of roughly 6.8 m. In December the sun is only about 13° up and shadows stretch much further. Drawn for a garden facing north, where it matters most.

How we’d take it forward in Wigan

If your Wigan plot already has planning permission, we begin by checking the approved drawings and conditions against the site. Some permissions need detailed design, discharge of conditions or a minor amendment before they can be built. We then prepare the technical drawings, arrange Building Regulations approval and the warranty, apply for utility connections and give you a written quote to build.

  1. Free plot appraisal

    We check the title plan, access, constraints and planning policy from our desk, talk the plot through with you, and visit if it looks viable. There’s no cost and no obligation.

  2. Planning and approvals

    We submit the planning application and manage it to a decision, then deal with conditions, Building Regulations approval, the structural warranty, any build-over agreement and the new utility connections.

  3. Written quote and build

    Once design and survey are complete you get a written quote. The build runs in stages — access and groundworks, foundations, frame and roof, fit-out and external works — with inspections at each key point.

  4. Handover

    You receive the completion certificate, warranty documents, Energy Performance Certificate, manuals and utility details, so the new home is ready to move into, let or put on the market.

Worth checking early

  • Planning can be refused, and money spent on surveys, design and the application isn’t recovered if it is — which is why we start with an appraisal.
  • Building and selling a new home can change your tax position compared with selling only your house; take advice from a tax adviser first.
  • A build next door means months of noise, deliveries and contractors near your home; good planning reduces the disruption but doesn’t remove it.

Wigan: questions to ask

Can the new home in my Wigan garden connect to the main sewer?

Usually, yes, but the route and depth decide how easily. The new home needs its own foul connection, agreed with the water company, and gravity drainage is simplest where the sewer sits lower than the new floor. If it doesn’t, a pumped connection may be needed. Where a public sewer runs under your garden, a build-over agreement or diversion may also be required.

Do new homes in Wigan need a structural warranty?

If the house will ever be sold or mortgaged, in practice yes. Mortgage lenders usually expect a 10-year structural warranty on a new home, though some accept an architect’s or surveyor’s certificate, and a warranty provider inspects the work at stages during the build, so it has to be in place before construction starts. Building control approval is separate and also required; a buyer’s solicitor will ask for both.

Who decides planning for a garden house in Wigan?

Wigan Council decides applications for addresses in Wigan, using the council’s Local Plan, national policy and its own design guidance. Neighbours and consultees such as highways officers can comment, and the decision is made by the council’s planning officers or, where the rules allow, its planning committee. Pre-application advice from the council can help test a scheme before the formal application is submitted.

How close can a new house be to my own in Wigan?

There’s no single national distance. Many councils use separation guides of around 21 metres between facing back windows and around 12 to 15 metres between a back window and a blank side wall, but the guidance used by Wigan Council decides. Window positions, ground levels, roof shape and screening all affect what is acceptable, which is why we survey before we design.