Build a new home in your garden in Irlam

For a garden in Irlam to take a new house, three things have to line up: a safe way in, enough space to keep both homes private and light, and services that can reach the plot at sensible cost. Our free appraisal looks at all three before you spend anything.

If they line up, we move on to a measured survey, design and, where useful, pre-application advice from Salford City Council. Planning permission is the council’s decision, so the design is shaped around the tests its officers apply rather than the largest house the plot could possibly hold.

Timber-frame house under construction with scaffolding at the bottom of a back garden, seen from the patio
Planning authority
Salford City Council
Postcodes
M44
Noon sun, 21 March
About 37°
Shadow from a 5 m eaves line
About 6.7 m
Planning plan
Local Plan
County
Greater Manchester

What the council will look at in Irlam

In Irlam, applications for a new home in a garden are decided by Salford City Council, which weighs them against the council’s Local Plan and national policy. Officers look at access, privacy, daylight, parking, bins, drainage and how much garden is left for each house, and neighbours can comment during consultation.

We read the local policies and any design guidance before drawing a line, and check the planning history of nearby plots for decisions that show how the council has applied them. If the policy picture is uncertain, pre-application advice lets us test the scheme with officers before the formal application goes in.

Section showing noon sun and shadows in Irlam: about 37 degrees on 21 March and 13 degrees on 21 December21 m21 Mar, noon: sun 37°, shadow 6.7 m21 Dec, noon: sun 13°, shadow 21.5 mExistingNew home
This section is worked out for the latitude of Irlam: around 37° of sun at midday in late March and about 13° at midwinter. It shows why the gap between your house and a new home behind it is about light as well as privacy. Garden assumed to face north.

From first call to decision

If your Irlam plot already has planning permission, we begin by checking the approved drawings and conditions against the site. Some permissions need detailed design, discharge of conditions or a minor amendment before they can be built. We then prepare the technical drawings, arrange Building Regulations approval and the warranty, apply for utility connections and give you a written quote to build.

  1. Free plot appraisal

    We check the title plan, access, constraints and planning policy from our desk, talk the plot through with you, and visit if it looks viable. There’s no cost and no obligation.

  2. Survey and design

    A measured survey records levels, boundaries, trees and neighbouring windows. We then design a layout and house that suit the plot, the street and your budget, and decide whether pre-application advice is worth seeking.

  3. Planning and approvals

    We submit the planning application and manage it to a decision, then deal with conditions, Building Regulations approval, the structural warranty, any build-over agreement and the new utility connections.

  4. Written quote and build

    Once design and survey are complete you get a written quote. The build runs in stages — access and groundworks, foundations, frame and roof, fit-out and external works — with inspections at each key point.

Worth checking early

  • A build next door means months of noise, deliveries and contractors near your home; good planning reduces the disruption but doesn’t remove it.
  • Planning can be refused, and money spent on surveys, design and the application isn’t recovered if it is — which is why we start with an appraisal.
  • Building and selling a new home can change your tax position compared with selling only your house; take advice from a tax adviser first.

Questions about garden plots in Irlam

Can the new home in my Irlam garden connect to the main sewer?

Usually, yes, but the route and depth decide how easily. The new home needs its own foul connection, agreed with the water company, and gravity drainage is simplest where the sewer sits lower than the new floor. If it doesn’t, a pumped connection may be needed. Where a public sewer runs under your garden, a build-over agreement or diversion may also be required.

Do you visit gardens in Irlam before giving advice?

We start with a desk review of the title plan, access, constraints and planning policy, then talk the plot through with you. If it looks viable, we arrange a site visit to see the access, levels, trees and neighbouring windows for ourselves. The appraisal is free and carries no obligation.

Will I pay Community Infrastructure Levy on a new home in Irlam?

Only if Salford City Council has adopted a Community Infrastructure Levy charging schedule; not every council has. Where it applies, it can be charged on a new home of any size. A self-build exemption exists for people building a home to live in, but it must be claimed before work starts, so we check the position at design stage.

How long does planning take for a new home in a Irlam garden?

The statutory period for deciding a minor application, such as a single new home, is 8 weeks from the date the council receives a valid application, in both England and Wales. In practice many applications take longer, and the council may ask you to agree an extension in writing. Surveys and design before submission add time, and conditions may need approving afterwards.

Other options in Irlam

Build in your garden near Irlam

Find out what your garden could become