Alton: light, access and policy
Construction on a Alton garden plot runs to a programme agreed once East Hampshire District Council has issued permission and any pre-commencement conditions have been dealt with. Groundworks and foundations come first; the shell and roof follow, then glazing, internal trades and, last of all, the drive and planting.
Weather matters. Around 21 December the sun in Alton climbs to only about 15° at midday, so winter days are short and wet ground slows the work. Where we can, we order the job so the house is weathertight before the worst months arrive.
How we’d take it forward in Alton
Once you ask for an appraisal of your Alton garden, we start with the paperwork: the title plan, any covenants, flood maps, tree and conservation designations, and planning decisions on nearby plots. A short call follows, then a site visit if the plot passes the desk check. You get our straight view of what’s realistic and what happens next, with no obligation to go further.
Free plot appraisal
We check the title plan, access, constraints and planning policy from our desk, talk the plot through with you, and visit if it looks viable. There’s no cost and no obligation.
Survey and design
A measured survey records levels, boundaries, trees and neighbouring windows. We then design a layout and house that suit the plot, the street and your budget, and decide whether pre-application advice is worth seeking.
Planning and approvals
We submit the planning application and manage it to a decision, then deal with conditions, Building Regulations approval, the structural warranty, any build-over agreement and the new utility connections.
Written quote and build
Once design and survey are complete you get a written quote. The build runs in stages — access and groundworks, foundations, frame and roof, fit-out and external works — with inspections at each key point.
Worth checking early
- Building and selling a new home can change your tax position compared with selling only your house; take advice from a tax adviser first.
- Planning can be refused, and money spent on surveys, design and the application isn’t recovered if it is — which is why we start with an appraisal.
- You fund the build and carry the cost risk; ground conditions, sewer diversions or supply upgrades found later can move the price.
Your questions, answered for Alton
Can I build a house in my Alton garden and then sell it?
Yes. You keep the land while the home is built, then sell the finished house. Before building starts, the plot should be given its own title through a transfer of part at HM Land Registry, and if your house is mortgaged your lender must agree to release the plot. Selling a home you’ve built can change your tax position, so take advice from a tax adviser first.
How long does planning take for a new home in a Alton garden?
The statutory period for deciding a minor application, such as a single new home, is 8 weeks from the date the council receives a valid application, in both England and Wales. In practice many applications take longer, and the council may ask you to agree an extension in writing. Surveys and design before submission add time, and conditions may need approving afterwards.
Can the new home in my Alton garden connect to the main sewer?
Usually, yes, but the route and depth decide how easily. The new home needs its own foul connection, agreed with the water company, and gravity drainage is simplest where the sewer sits lower than the new floor. If it doesn’t, a pumped connection may be needed. Where a public sewer runs under your garden, a build-over agreement or diversion may also be required.
Will I pay Community Infrastructure Levy on a new home in Alton?
Only if East Hampshire District Council has adopted a Community Infrastructure Levy charging schedule; not every council has. Where it applies, it can be charged on a new home of any size. A self-build exemption exists for people building a home to live in, but it must be claimed before work starts, so we check the position at design stage.
Other options in Alton
- Joint venture on your garden plot
- Planning permission for a garden plot
- Plot feasibility and design
- Garden plot option agreement
- Combine gardens with your neighbours
- Garage courts and yards