Build a new home in your garden in Bordon

For a garden in Bordon to take a new house, three things have to line up: a safe way in, enough space to keep both homes private and light, and services that can reach the plot at sensible cost. Our free appraisal looks at all three before you spend anything.

If they line up, we move on to a measured survey, design and, where useful, pre-application advice from East Hampshire District Council. Planning permission is the council’s decision, so the design is shaped around the tests its officers apply rather than the largest house the plot could possibly hold.

Timber-frame house under construction with scaffolding at the bottom of a back garden, seen from the patio
Planning authority
East Hampshire District Council
Postcodes
GU35
Noon sun, 21 March
About 39°
Shadow from a 5 m eaves line
About 6.2 m
Planning plan
Local Plan
County
Hampshire

The local picture in Bordon

Daylight is one of the first things East Hampshire District Council will check on a garden house. At midday on 21 March the sun in Bordon stands roughly 39° above the horizon, so an eaves line about 5 m high casts a shadow of around 6.2 m. On 21 December the sun is only about 15° up and shadows stretch far longer.

That’s why the gap between your house and the new one, and the height of the new roof, are set by measurement rather than guesswork. A lower eaves line, a hipped roof or a single-storey section can make a real difference to the gardens either side.

Section showing noon sun and shadows in Bordon: about 39 degrees on 21 March and 15 degrees on 21 December21 m21 Mar, noon: sun 39°, shadow 6.2 m21 Dec, noon: sun 15°, shadow 18.1 mExistingNew home
Noon sun in Bordon on 21 March sits about 39° above the horizon, so a typical two-storey eaves line (about 5 m) throws a shadow of roughly 6.2 m. In December the sun is only about 15° up and shadows stretch much further. Drawn for a garden facing north, where it matters most.

From first call to decision

Once you ask for an appraisal of your Bordon garden, we start with the paperwork: the title plan, any covenants, flood maps, tree and conservation designations, and planning decisions on nearby plots. A short call follows, then a site visit if the plot passes the desk check. You get our straight view of what’s realistic and what happens next, with no obligation to go further.

  1. Free plot appraisal

    We check the title plan, access, constraints and planning policy from our desk, talk the plot through with you, and visit if it looks viable. There’s no cost and no obligation.

  2. Survey and design

    A measured survey records levels, boundaries, trees and neighbouring windows. We then design a layout and house that suit the plot, the street and your budget, and decide whether pre-application advice is worth seeking.

  3. Planning and approvals

    We submit the planning application and manage it to a decision, then deal with conditions, Building Regulations approval, the structural warranty, any build-over agreement and the new utility connections.

  4. Written quote and build

    Once design and survey are complete you get a written quote. The build runs in stages — access and groundworks, foundations, frame and roof, fit-out and external works — with inspections at each key point.

Worth checking early

  • Building and selling a new home can change your tax position compared with selling only your house; take advice from a tax adviser first.
  • A build next door means months of noise, deliveries and contractors near your home; good planning reduces the disruption but doesn’t remove it.
  • Your own garden gets smaller and the new home will be visible from your house, so screening and separation matter for both homes.

Questions about garden plots in Bordon

Will I pay Community Infrastructure Levy on a new home in Bordon?

Only if East Hampshire District Council has adopted a Community Infrastructure Levy charging schedule; not every council has. Where it applies, it can be charged on a new home of any size. A self-build exemption exists for people building a home to live in, but it must be claimed before work starts, so we check the position at design stage.

Can the new home in my Bordon garden connect to the main sewer?

Usually, yes, but the route and depth decide how easily. The new home needs its own foul connection, agreed with the water company, and gravity drainage is simplest where the sewer sits lower than the new floor. If it doesn’t, a pumped connection may be needed. Where a public sewer runs under your garden, a build-over agreement or diversion may also be required.

How long does planning take for a new home in a Bordon garden?

The statutory period for deciding a minor application, such as a single new home, is 8 weeks from the date the council receives a valid application, in both England and Wales. In practice many applications take longer, and the council may ask you to agree an extension in writing. Surveys and design before submission add time, and conditions may need approving afterwards.

Can I build a house in my Bordon garden and then sell it?

Yes. You keep the land while the home is built, then sell the finished house. Before building starts, the plot should be given its own title through a transfer of part at HM Land Registry, and if your house is mortgaged your lender must agree to release the plot. Selling a home you’ve built can change your tax position, so take advice from a tax adviser first.

Other options in Bordon

Build in your garden near Bordon

Find out what your garden could become

Free garden plot appraisal. No cost, no obligation, and a straight answer if it won’t work.