Build a new home in your garden in Haslemere

Our garden design and build service is for Haslemere owners who want to keep their land and have a new home built on it, managed from the first appraisal to handover. We cover Haslemere and the places around it, and manage every stage for you.

The order of work is clear. Appraisal and survey come first, then design and the planning application, then Building Regulations, the warranty, utility applications and a written quote. Only then does construction start, in stages with inspections, ending with a handover pack you can pass to a buyer, tenant or family member.

Timber-frame house under construction with scaffolding at the bottom of a back garden, seen from the patio
Planning authority
Waverley Borough Council
Postcodes
GU26, GU27
Noon sun, 21 March
About 39°
Shadow from a 5 m eaves line
About 6.2 m
Planning plan
Local Plan
County
Surrey

Before you decide in Haslemere

We cover gardens in Haslemere and nearby places such as Bordon, Godalming and Farnham, with the same process wherever you are: a free desktop appraisal, a visit if the plot looks viable, then survey and design.

Some of those places may fall under a different council from Waverley Borough Council, and each local planning authority has its own design guidance, validation list and pre-application service. We confirm which authority covers your address at the start, so the application is prepared for the right requirements first time and avoids delays at validation.

Section showing noon sun and shadows in Haslemere: about 39 degrees on 21 March and 15 degrees on 21 December21 m21 Mar, noon: sun 39°, shadow 6.2 m21 Dec, noon: sun 15°, shadow 18.1 mExistingNew home
This section is worked out for the latitude of Haslemere: around 39° of sun at midday in late March and about 15° at midwinter. It shows why the gap between your house and a new home behind it is about light as well as privacy. Garden assumed to face north.

What happens next in Haslemere

Once you ask for an appraisal of your Haslemere garden, we start with the paperwork: the title plan, any covenants, flood maps, tree and conservation designations, and planning decisions on nearby plots. A short call follows, then a site visit if the plot passes the desk check. You get our straight view of what’s realistic and what happens next, with no obligation to go further.

  1. Free plot appraisal

    We check the title plan, access, constraints and planning policy from our desk, talk the plot through with you, and visit if it looks viable. There’s no cost and no obligation.

  2. Planning and approvals

    We submit the planning application and manage it to a decision, then deal with conditions, Building Regulations approval, the structural warranty, any build-over agreement and the new utility connections.

  3. Written quote and build

    Once design and survey are complete you get a written quote. The build runs in stages — access and groundworks, foundations, frame and roof, fit-out and external works — with inspections at each key point.

  4. Handover

    You receive the completion certificate, warranty documents, Energy Performance Certificate, manuals and utility details, so the new home is ready to move into, let or put on the market.

Worth checking early

  • A build next door means months of noise, deliveries and contractors near your home; good planning reduces the disruption but doesn’t remove it.
  • Building and selling a new home can change your tax position compared with selling only your house; take advice from a tax adviser first.
  • Planning can be refused, and money spent on surveys, design and the application isn’t recovered if it is — which is why we start with an appraisal.

Haslemere: questions to ask

Do new homes in Haslemere need a structural warranty?

If the house will ever be sold or mortgaged, in practice yes. Mortgage lenders usually expect a 10-year structural warranty on a new home, though some accept an architect’s or surveyor’s certificate, and a warranty provider inspects the work at stages during the build, so it has to be in place before construction starts. Building control approval is separate and also required; a buyer’s solicitor will ask for both.

How close can a new house be to my own in Haslemere?

There’s no single national distance. Many councils use separation guides of around 21 metres between facing back windows and around 12 to 15 metres between a back window and a blank side wall, but the guidance used by Waverley Borough Council decides. Window positions, ground levels, roof shape and screening all affect what is acceptable, which is why we survey before we design.

Do you visit gardens in Haslemere before giving advice?

We start with a desk review of the title plan, access, constraints and planning policy, then talk the plot through with you. If it looks viable, we arrange a site visit to see the access, levels, trees and neighbouring windows for ourselves. The appraisal is free and carries no obligation.

How long does planning take for a new home in a Haslemere garden?

The statutory period for deciding a minor application, such as a single new home, is 8 weeks from the date the council receives a valid application, in both England and Wales. In practice many applications take longer, and the council may ask you to agree an extension in writing. Surveys and design before submission add time, and conditions may need approving afterwards.