The local picture in Gosport
Wherever your house sits across PO12, a new home behind it needs water, power and two kinds of drainage — one for waste, one for rain. We contact the utility providers early, because a long cable run, a sewer at the wrong depth or a public pipe under the lawn can change both the layout and the cost.
Rain from the new roof and drive has to be dealt with on site, and Gosport Borough Council will want to see how. Where a public sewer crosses your garden, the water company may also need a build-over agreement before work starts, so we check sewer records at appraisal stage.
How we’d take it forward in Gosport
From appraisal to a decision from Gosport Borough Council, each step in Gosport is agreed before it starts. After the site visit we quote for survey and design; after design we prepare the application; after permission we deal with conditions and technical approvals and give you a written build quote. Each stage is a separate decision for you, with its cost set out first.
Free plot appraisal
We check the title plan, access, constraints and planning policy from our desk, talk the plot through with you, and visit if it looks viable. There’s no cost and no obligation.
Survey and design
A measured survey records levels, boundaries, trees and neighbouring windows. We then design a layout and house that suit the plot, the street and your budget, and decide whether pre-application advice is worth seeking.
Planning and approvals
We submit the planning application and manage it to a decision, then deal with conditions, Building Regulations approval, the structural warranty, any build-over agreement and the new utility connections.
Handover
You receive the completion certificate, warranty documents, Energy Performance Certificate, manuals and utility details, so the new home is ready to move into, let or put on the market.
Worth checking early
- You fund the build and carry the cost risk; ground conditions, sewer diversions or supply upgrades found later can move the price.
- Planning can be refused, and money spent on surveys, design and the application isn’t recovered if it is — which is why we start with an appraisal.
- Building and selling a new home can change your tax position compared with selling only your house; take advice from a tax adviser first.
Gosport: questions to ask
Can I build a house in my Gosport garden and then sell it?
Yes. You keep the land while the home is built, then sell the finished house. Before building starts, the plot should be given its own title through a transfer of part at HM Land Registry, and if your house is mortgaged your lender must agree to release the plot. Selling a home you’ve built can change your tax position, so take advice from a tax adviser first.
How long does planning take for a new home in a Gosport garden?
The statutory period for deciding a minor application, such as a single new home, is 8 weeks from the date the council receives a valid application, in both England and Wales. In practice many applications take longer, and the council may ask you to agree an extension in writing. Surveys and design before submission add time, and conditions may need approving afterwards.
Can I build a house in my garden in Gosport and keep the land?
Yes. On our design and build route you remain the owner while we design the home, apply to Gosport Borough Council for planning, deal with Building Regulations and build it. The finished house can be sold, let or kept for family. Whether your plot can take a house depends on access, space, neighbours and local policy, and the decision rests with the council.
Will I pay Community Infrastructure Levy on a new home in Gosport?
Only if Gosport Borough Council has adopted a Community Infrastructure Levy charging schedule; not every council has. Where it applies, it can be charged on a new home of any size. A self-build exemption exists for people building a home to live in, but it must be claimed before work starts, so we check the position at design stage.
Other options in Gosport
- Planning permission for a garden plot
- Garden plot option agreement
- Planning promotion for your garden plot
- Plot feasibility and design
- Garage courts and yards
- Tandem and landlocked plots