Build a new home in your garden in Bushey

Our garden design and build service is for Bushey owners who want to keep their land and have a new home built on it, managed from the first appraisal to handover. We cover Bushey and the places around it, and manage every stage for you.

The order of work is clear. Appraisal and survey come first, then design and the planning application, then Building Regulations, the warranty, utility applications and a written quote. Only then does construction start, in stages with inspections, ending with a handover pack you can pass to a buyer, tenant or family member.

Timber-frame house under construction with scaffolding at the bottom of a back garden, seen from the patio
Planning authority
Hertsmere Borough Council
Postcodes
WD23
Noon sun, 21 March
About 38°
Shadow from a 5 m eaves line
About 6.3 m
Planning plan
Local Plan
County
Hertfordshire

The local picture in Bushey

In Bushey, applications for a new home in a garden are decided by Hertsmere Borough Council, which weighs them against the council’s Local Plan and national policy. Officers look at access, privacy, daylight, parking, bins, drainage and how much garden is left for each house, and neighbours can comment during consultation.

We read the local policies and any design guidance before drawing a line, and check the planning history of nearby plots for decisions that show how the council has applied them. If the policy picture is uncertain, pre-application advice lets us test the scheme with officers before the formal application goes in.

Section showing noon sun and shadows in Bushey: about 38 degrees on 21 March and 15 degrees on 21 December21 m21 Mar, noon: sun 38°, shadow 6.3 m21 Dec, noon: sun 15°, shadow 18.8 mExistingNew home
Noon sun in Bushey on 21 March sits about 38° above the horizon, so a typical two-storey eaves line (about 5 m) throws a shadow of roughly 6.3 m. In December the sun is only about 15° up and shadows stretch much further. Drawn for a garden facing north, where it matters most.

How we’d take it forward in Bushey

If your Bushey plot already has planning permission, we begin by checking the approved drawings and conditions against the site. Some permissions need detailed design, discharge of conditions or a minor amendment before they can be built. We then prepare the technical drawings, arrange Building Regulations approval and the warranty, apply for utility connections and give you a written quote to build.

  1. Free plot appraisal

    We check the title plan, access, constraints and planning policy from our desk, talk the plot through with you, and visit if it looks viable. There’s no cost and no obligation.

  2. Survey and design

    A measured survey records levels, boundaries, trees and neighbouring windows. We then design a layout and house that suit the plot, the street and your budget, and decide whether pre-application advice is worth seeking.

  3. Written quote and build

    Once design and survey are complete you get a written quote. The build runs in stages — access and groundworks, foundations, frame and roof, fit-out and external works — with inspections at each key point.

  4. Handover

    You receive the completion certificate, warranty documents, Energy Performance Certificate, manuals and utility details, so the new home is ready to move into, let or put on the market.

Worth checking early

  • Your own garden gets smaller and the new home will be visible from your house, so screening and separation matter for both homes.
  • You fund the build and carry the cost risk; ground conditions, sewer diversions or supply upgrades found later can move the price.
  • Planning can be refused, and money spent on surveys, design and the application isn’t recovered if it is — which is why we start with an appraisal.

Questions about garden plots in Bushey

Do new homes in Bushey need a structural warranty?

If the house will ever be sold or mortgaged, in practice yes. Mortgage lenders usually expect a 10-year structural warranty on a new home, though some accept an architect’s or surveyor’s certificate, and a warranty provider inspects the work at stages during the build, so it has to be in place before construction starts. Building control approval is separate and also required; a buyer’s solicitor will ask for both.

Will I pay Community Infrastructure Levy on a new home in Bushey?

Only if Hertsmere Borough Council has adopted a Community Infrastructure Levy charging schedule; not every council has. Where it applies, it can be charged on a new home of any size. A self-build exemption exists for people building a home to live in, but it must be claimed before work starts, so we check the position at design stage.

Do you visit gardens in Bushey before giving advice?

We start with a desk review of the title plan, access, constraints and planning policy, then talk the plot through with you. If it looks viable, we arrange a site visit to see the access, levels, trees and neighbouring windows for ourselves. The appraisal is free and carries no obligation.

Can I build a house in my garden in Bushey and keep the land?

Yes. On our design and build route you remain the owner while we design the home, apply to Hertsmere Borough Council for planning, deal with Building Regulations and build it. The finished house can be sold, let or kept for family. Whether your plot can take a house depends on access, space, neighbours and local policy, and the decision rests with the council.

Other options in Bushey

Build in your garden near Bushey

Find out what your garden could become

Free garden plot appraisal. No cost, no obligation, and a straight answer if it won’t work.