Build a new home in your garden in Leicester

Building a second home behind your own in Leicester is a construction project with one unusual feature: you live beside the site from the first spade to the last coat of paint. That shapes how we plan it, from the fence that separates your garden on day one to where deliveries park.

The route covers everything between an idea and a finished house. We survey and design, prepare and submit the planning application, arrange Building Regulations approval and the structural warranty, organise new water, drainage and electricity connections, and then build. You keep ownership of the land throughout.

Timber-frame house under construction with scaffolding at the bottom of a back garden, seen from the patio
Planning authority
Leicester City Council
Postcodes
LE1, LE2, LE3, LE4, LE5
Noon sun, 21 March
About 37°
Shadow from a 5 m eaves line
About 6.5 m
Planning plan
Local Plan
County
Leicestershire

How it plays out in Leicester

Access is where a garden plot anywhere in LE1, LE2, LE3 and LE4 tends to succeed or fail. A new drive needs enough width for cars, clear visibility where it meets the road, and enough distance from neighbouring windows to keep noise and headlights in check.

Policies in the council’s Local Plan, along with any highways advice the council receives, decide the detail for your address. We measure the gap beside your house on the first visit, and if it’s too tight for a home that can be approved and built safely, we’ll tell you before any design fees are spent.

Section showing noon sun and shadows in Leicester: about 37 degrees on 21 March and 14 degrees on 21 December21 m21 Mar, noon: sun 37°, shadow 6.5 m21 Dec, noon: sun 14°, shadow 20.2 mExistingNew home
This section is worked out for the latitude of Leicester: around 37° of sun at midday in late March and about 14° at midwinter. It shows why the gap between your house and a new home behind it is about light as well as privacy. Garden assumed to face north.

The next steps, locally

If your Leicester plot already has planning permission, we begin by checking the approved drawings and conditions against the site. Some permissions need detailed design, discharge of conditions or a minor amendment before they can be built. We then prepare the technical drawings, arrange Building Regulations approval and the warranty, apply for utility connections and give you a written quote to build.

  1. Free plot appraisal

    We check the title plan, access, constraints and planning policy from our desk, talk the plot through with you, and visit if it looks viable. There’s no cost and no obligation.

  2. Survey and design

    A measured survey records levels, boundaries, trees and neighbouring windows. We then design a layout and house that suit the plot, the street and your budget, and decide whether pre-application advice is worth seeking.

  3. Written quote and build

    Once design and survey are complete you get a written quote. The build runs in stages — access and groundworks, foundations, frame and roof, fit-out and external works — with inspections at each key point.

  4. Handover

    You receive the completion certificate, warranty documents, Energy Performance Certificate, manuals and utility details, so the new home is ready to move into, let or put on the market.

Worth checking early

  • Planning can be refused, and money spent on surveys, design and the application isn’t recovered if it is — which is why we start with an appraisal.
  • You fund the build and carry the cost risk; ground conditions, sewer diversions or supply upgrades found later can move the price.
  • Building and selling a new home can change your tax position compared with selling only your house; take advice from a tax adviser first.

Leicester: questions to ask

Can the new home in my Leicester garden connect to the main sewer?

Usually, yes, but the route and depth decide how easily. The new home needs its own foul connection, agreed with the water company, and gravity drainage is simplest where the sewer sits lower than the new floor. If it doesn’t, a pumped connection may be needed. Where a public sewer runs under your garden, a build-over agreement or diversion may also be required.

Can I build a house in my Leicester garden and then sell it?

Yes. You keep the land while the home is built, then sell the finished house. Before building starts, the plot should be given its own title through a transfer of part at HM Land Registry, and if your house is mortgaged your lender must agree to release the plot. Selling a home you’ve built can change your tax position, so take advice from a tax adviser first.

How long does planning take for a new home in a Leicester garden?

The statutory period for deciding a minor application, such as a single new home, is 8 weeks from the date the council receives a valid application, in both England and Wales. In practice many applications take longer, and the council may ask you to agree an extension in writing. Surveys and design before submission add time, and conditions may need approving afterwards.

Who decides planning for a garden house in Leicester?

Leicester City Council decides applications for addresses in Leicester, using the council’s Local Plan, national policy and its own design guidance. Neighbours and consultees such as highways officers can comment, and the decision is made by the council’s planning officers or, where the rules allow, its planning committee. Pre-application advice from the council can help test a scheme before the formal application is submitted.