Build a new home in your garden in Oadby

A new home in your Oadby garden can be built to sell, to let or for someone in the family, and the right design differs for each. A home for sale needs its own title, a structural warranty for buyers’ lenders and a layout with wide appeal. A family home might put level access or a shared garden gate first.

We talk that through at the start, because it changes the size, the specification and the legal set-up. From there we take the plot through design, planning, approvals and construction, handing over a finished home with its certificates and warranty documents.

Timber-frame house under construction with scaffolding at the bottom of a back garden, seen from the patio
Planning authority
Oadby and Wigston Borough Council
Postcodes
LE2
Noon sun, 21 March
About 37°
Shadow from a 5 m eaves line
About 6.5 m
Planning plan
Local Plan
County
Leicestershire

What the council will look at in Oadby

In Oadby, applications for a new home in a garden are decided by Oadby and Wigston Borough Council, which weighs them against the council’s Local Plan and national policy. Officers look at access, privacy, daylight, parking, bins, drainage and how much garden is left for each house, and neighbours can comment during consultation.

We read the local policies and any design guidance before drawing a line, and check the planning history of nearby plots for decisions that show how the council has applied them. If the policy picture is uncertain, pre-application advice lets us test the scheme with officers before the formal application goes in.

Section showing noon sun and shadows in Oadby: about 37 degrees on 21 March and 14 degrees on 21 December21 m21 Mar, noon: sun 37°, shadow 6.5 m21 Dec, noon: sun 14°, shadow 20.1 mExistingNew home
Noon sun in Oadby on 21 March sits about 37° above the horizon, so a typical two-storey eaves line (about 5 m) throws a shadow of roughly 6.5 m. In December the sun is only about 14° up and shadows stretch much further. Drawn for a garden facing north, where it matters most.

The next steps, locally

If your Oadby plot already has planning permission, we begin by checking the approved drawings and conditions against the site. Some permissions need detailed design, discharge of conditions or a minor amendment before they can be built. We then prepare the technical drawings, arrange Building Regulations approval and the warranty, apply for utility connections and give you a written quote to build.

  1. Free plot appraisal

    We check the title plan, access, constraints and planning policy from our desk, talk the plot through with you, and visit if it looks viable. There’s no cost and no obligation.

  2. Planning and approvals

    We submit the planning application and manage it to a decision, then deal with conditions, Building Regulations approval, the structural warranty, any build-over agreement and the new utility connections.

  3. Written quote and build

    Once design and survey are complete you get a written quote. The build runs in stages — access and groundworks, foundations, frame and roof, fit-out and external works — with inspections at each key point.

  4. Handover

    You receive the completion certificate, warranty documents, Energy Performance Certificate, manuals and utility details, so the new home is ready to move into, let or put on the market.

Worth checking early

  • Planning can be refused, and money spent on surveys, design and the application isn’t recovered if it is — which is why we start with an appraisal.
  • You fund the build and carry the cost risk; ground conditions, sewer diversions or supply upgrades found later can move the price.
  • Building and selling a new home can change your tax position compared with selling only your house; take advice from a tax adviser first.

Questions about garden plots in Oadby

Who decides planning for a garden house in Oadby?

Oadby and Wigston Borough Council decides applications for addresses in Oadby, using the council’s Local Plan, national policy and its own design guidance. Neighbours and consultees such as highways officers can comment, and the decision is made by the council’s planning officers or, where the rules allow, its planning committee. Pre-application advice from the council can help test a scheme before the formal application is submitted.

How long does planning take for a new home in a Oadby garden?

The statutory period for deciding a minor application, such as a single new home, is 8 weeks from the date the council receives a valid application, in both England and Wales. In practice many applications take longer, and the council may ask you to agree an extension in writing. Surveys and design before submission add time, and conditions may need approving afterwards.

Can the new home in my Oadby garden connect to the main sewer?

Usually, yes, but the route and depth decide how easily. The new home needs its own foul connection, agreed with the water company, and gravity drainage is simplest where the sewer sits lower than the new floor. If it doesn’t, a pumped connection may be needed. Where a public sewer runs under your garden, a build-over agreement or diversion may also be required.

Do new homes in Oadby need a structural warranty?

If the house will ever be sold or mortgaged, in practice yes. Mortgage lenders usually expect a 10-year structural warranty on a new home, though some accept an architect’s or surveyor’s certificate, and a warranty provider inspects the work at stages during the build, so it has to be in place before construction starts. Building control approval is separate and also required; a buyer’s solicitor will ask for both.