Build a new home in your garden in Corby

For a garden in Corby to take a new house, three things have to line up: a safe way in, enough space to keep both homes private and light, and services that can reach the plot at sensible cost. Our free appraisal looks at all three before you spend anything.

If they line up, we move on to a measured survey, design and, where useful, pre-application advice from North Northamptonshire Council. Planning permission is the council’s decision, so the design is shaped around the tests its officers apply rather than the largest house the plot could possibly hold.

Timber-frame house under construction with scaffolding at the bottom of a back garden, seen from the patio
Planning authority
North Northamptonshire Council
Postcodes
NN17, NN18
Noon sun, 21 March
About 38°
Shadow from a 5 m eaves line
About 6.5 m
Planning plan
Local Plan
County
Northamptonshire

The local picture in Corby

Daylight is one of the first things North Northamptonshire Council will check on a garden house. At midday on 21 March the sun in Corby stands roughly 38° above the horizon, so an eaves line about 5 m high casts a shadow of around 6.5 m. On 21 December the sun is only about 14° up and shadows stretch far longer.

That’s why the gap between your house and the new one, and the height of the new roof, are set by measurement rather than guesswork. A lower eaves line, a hipped roof or a single-storey section can make a real difference to the gardens either side.

Section showing noon sun and shadows in Corby: about 38 degrees on 21 March and 14 degrees on 21 December21 m21 Mar, noon: sun 38°, shadow 6.5 m21 Dec, noon: sun 14°, shadow 20.0 mExistingNew home
Noon sun in Corby on 21 March sits about 38° above the horizon, so a typical two-storey eaves line (about 5 m) throws a shadow of roughly 6.5 m. In December the sun is only about 14° up and shadows stretch much further. Drawn for a garden facing north, where it matters most.

How we’d take it forward in Corby

If your Corby plot already has planning permission, we begin by checking the approved drawings and conditions against the site. Some permissions need detailed design, discharge of conditions or a minor amendment before they can be built. We then prepare the technical drawings, arrange Building Regulations approval and the warranty, apply for utility connections and give you a written quote to build.

  1. Free plot appraisal

    We check the title plan, access, constraints and planning policy from our desk, talk the plot through with you, and visit if it looks viable. There’s no cost and no obligation.

  2. Survey and design

    A measured survey records levels, boundaries, trees and neighbouring windows. We then design a layout and house that suit the plot, the street and your budget, and decide whether pre-application advice is worth seeking.

  3. Written quote and build

    Once design and survey are complete you get a written quote. The build runs in stages — access and groundworks, foundations, frame and roof, fit-out and external works — with inspections at each key point.

  4. Handover

    You receive the completion certificate, warranty documents, Energy Performance Certificate, manuals and utility details, so the new home is ready to move into, let or put on the market.

Worth checking early

  • A build next door means months of noise, deliveries and contractors near your home; good planning reduces the disruption but doesn’t remove it.
  • Planning can be refused, and money spent on surveys, design and the application isn’t recovered if it is — which is why we start with an appraisal.
  • Building and selling a new home can change your tax position compared with selling only your house; take advice from a tax adviser first.

Corby: questions to ask

Can the new home in my Corby garden connect to the main sewer?

Usually, yes, but the route and depth decide how easily. The new home needs its own foul connection, agreed with the water company, and gravity drainage is simplest where the sewer sits lower than the new floor. If it doesn’t, a pumped connection may be needed. Where a public sewer runs under your garden, a build-over agreement or diversion may also be required.

Do you visit gardens in Corby before giving advice?

We start with a desk review of the title plan, access, constraints and planning policy, then talk the plot through with you. If it looks viable, we arrange a site visit to see the access, levels, trees and neighbouring windows for ourselves. The appraisal is free and carries no obligation.

Can I build a house in my garden in Corby and keep the land?

Yes. On our design and build route you remain the owner while we design the home, apply to North Northamptonshire Council for planning, deal with Building Regulations and build it. The finished house can be sold, let or kept for family. Whether your plot can take a house depends on access, space, neighbours and local policy, and the decision rests with the council.

How close can a new house be to my own in Corby?

There’s no single national distance. Many councils use separation guides of around 21 metres between facing back windows and around 12 to 15 metres between a back window and a blank side wall, but the guidance used by North Northamptonshire Council decides. Window positions, ground levels, roof shape and screening all affect what is acceptable, which is why we survey before we design.

Other options in Corby

Build in your garden near Corby

Find out what your garden could become

Free garden plot appraisal. No cost, no obligation, and a straight answer if it won’t work.