Before you decide in Cottesmore
Construction on a Cottesmore garden plot runs to a programme agreed once Rutland County Council has issued permission and any pre-commencement conditions have been dealt with. Groundworks and foundations come first; the shell and roof follow, then glazing, internal trades and, last of all, the drive and planting.
Weather matters. Around 21 December the sun in Cottesmore climbs to only about 14° at midday, so winter days are short and wet ground slows the work. Where we can, we order the job so the house is weathertight before the worst months arrive.
How we’d take it forward in Cottesmore
From appraisal to a decision from Rutland County Council, each step in Cottesmore is agreed before it starts. After the site visit we quote for survey and design; after design we prepare the application; after permission we deal with conditions and technical approvals and give you a written build quote. Each stage is a separate decision for you, with its cost set out first.
Free plot appraisal
We check the title plan, access, constraints and planning policy from our desk, talk the plot through with you, and visit if it looks viable. There’s no cost and no obligation.
Planning and approvals
We submit the planning application and manage it to a decision, then deal with conditions, Building Regulations approval, the structural warranty, any build-over agreement and the new utility connections.
Written quote and build
Once design and survey are complete you get a written quote. The build runs in stages — access and groundworks, foundations, frame and roof, fit-out and external works — with inspections at each key point.
Handover
You receive the completion certificate, warranty documents, Energy Performance Certificate, manuals and utility details, so the new home is ready to move into, let or put on the market.
Worth checking early
- You fund the build and carry the cost risk; ground conditions, sewer diversions or supply upgrades found later can move the price.
- Your own garden gets smaller and the new home will be visible from your house, so screening and separation matter for both homes.
- Building and selling a new home can change your tax position compared with selling only your house; take advice from a tax adviser first.
Your questions, answered for Cottesmore
Can I build a house in my garden in Cottesmore and keep the land?
Yes. On our design and build route you remain the owner while we design the home, apply to Rutland County Council for planning, deal with Building Regulations and build it. The finished house can be sold, let or kept for family. Whether your plot can take a house depends on access, space, neighbours and local policy, and the decision rests with the council.
Will I pay Community Infrastructure Levy on a new home in Cottesmore?
Only if Rutland County Council has adopted a Community Infrastructure Levy charging schedule; not every council has. Where it applies, it can be charged on a new home of any size. A self-build exemption exists for people building a home to live in, but it must be claimed before work starts, so we check the position at design stage.
Can I build a house in my Cottesmore garden and then sell it?
Yes. You keep the land while the home is built, then sell the finished house. Before building starts, the plot should be given its own title through a transfer of part at HM Land Registry, and if your house is mortgaged your lender must agree to release the plot. Selling a home you’ve built can change your tax position, so take advice from a tax adviser first.
Can the new home in my Cottesmore garden connect to the main sewer?
Usually, yes, but the route and depth decide how easily. The new home needs its own foul connection, agreed with the water company, and gravity drainage is simplest where the sewer sits lower than the new floor. If it doesn’t, a pumped connection may be needed. Where a public sewer runs under your garden, a build-over agreement or diversion may also be required.
Other options in Cottesmore
- Planning permission for a garden plot
- Tandem and landlocked plots
- Corner and side plots
- Bungalows on large plots
- Planning promotion for your garden plot
- Large rear gardens