Build a new home in your garden in Ketton

Building a second home behind your own in Ketton is a construction project with one unusual feature: you live beside the site from the first spade to the last coat of paint. That shapes how we plan it, from the fence that separates your garden on day one to where deliveries park.

The route covers everything between an idea and a finished house. We survey and design, prepare and submit the planning application, arrange Building Regulations approval and the structural warranty, organise new water, drainage and electricity connections, and then build. You keep ownership of the land throughout.

Timber-frame house under construction with scaffolding at the bottom of a back garden, seen from the patio
Planning authority
Rutland County Council
Postcodes
PE9
Noon sun, 21 March
About 37°
Shadow from a 5 m eaves line
About 6.5 m
Planning plan
Local Plan
County
Rutland

The local picture in Ketton

Wherever your house sits across PE9, a new home behind it needs water, power and two kinds of drainage — one for waste, one for rain. We contact the utility providers early, because a long cable run, a sewer at the wrong depth or a public pipe under the lawn can change both the layout and the cost.

Rain from the new roof and drive has to be dealt with on site, and Rutland County Council will want to see how. Where a public sewer crosses your garden, the water company may also need a build-over agreement before work starts, so we check sewer records at appraisal stage.

Section showing noon sun and shadows in Ketton: about 37 degrees on 21 March and 14 degrees on 21 December21 m21 Mar, noon: sun 37°, shadow 6.5 m21 Dec, noon: sun 14°, shadow 20.2 mExistingNew home
Noon sun in Ketton on 21 March sits about 37° above the horizon, so a typical two-storey eaves line (about 5 m) throws a shadow of roughly 6.5 m. In December the sun is only about 14° up and shadows stretch much further. Drawn for a garden facing north, where it matters most.

From first call to decision

Once you ask for an appraisal of your Ketton garden, we start with the paperwork: the title plan, any covenants, flood maps, tree and conservation designations, and planning decisions on nearby plots. A short call follows, then a site visit if the plot passes the desk check. You get our straight view of what’s realistic and what happens next, with no obligation to go further.

  1. Free plot appraisal

    We check the title plan, access, constraints and planning policy from our desk, talk the plot through with you, and visit if it looks viable. There’s no cost and no obligation.

  2. Planning and approvals

    We submit the planning application and manage it to a decision, then deal with conditions, Building Regulations approval, the structural warranty, any build-over agreement and the new utility connections.

  3. Written quote and build

    Once design and survey are complete you get a written quote. The build runs in stages — access and groundworks, foundations, frame and roof, fit-out and external works — with inspections at each key point.

  4. Handover

    You receive the completion certificate, warranty documents, Energy Performance Certificate, manuals and utility details, so the new home is ready to move into, let or put on the market.

Worth checking early

  • Building and selling a new home can change your tax position compared with selling only your house; take advice from a tax adviser first.
  • Your own garden gets smaller and the new home will be visible from your house, so screening and separation matter for both homes.
  • You fund the build and carry the cost risk; ground conditions, sewer diversions or supply upgrades found later can move the price.

Ketton: questions to ask

Who decides planning for a garden house in Ketton?

Rutland County Council decides applications for addresses in Ketton, using the council’s Local Plan, national policy and its own design guidance. Neighbours and consultees such as highways officers can comment, and the decision is made by the council’s planning officers or, where the rules allow, its planning committee. Pre-application advice from the council can help test a scheme before the formal application is submitted.

Can I build a house in my Ketton garden and then sell it?

Yes. You keep the land while the home is built, then sell the finished house. Before building starts, the plot should be given its own title through a transfer of part at HM Land Registry, and if your house is mortgaged your lender must agree to release the plot. Selling a home you’ve built can change your tax position, so take advice from a tax adviser first.

Will I pay Community Infrastructure Levy on a new home in Ketton?

Only if Rutland County Council has adopted a Community Infrastructure Levy charging schedule; not every council has. Where it applies, it can be charged on a new home of any size. A self-build exemption exists for people building a home to live in, but it must be claimed before work starts, so we check the position at design stage.

Do new homes in Ketton need a structural warranty?

If the house will ever be sold or mortgaged, in practice yes. Mortgage lenders usually expect a 10-year structural warranty on a new home, though some accept an architect’s or surveyor’s certificate, and a warranty provider inspects the work at stages during the build, so it has to be in place before construction starts. Building control approval is separate and also required; a buyer’s solicitor will ask for both.

Other options in Ketton

Build in your garden near Ketton

Find out what your garden could become

Free garden plot appraisal. No cost, no obligation, and a straight answer if it won’t work.