Build a new home in your garden in Lichfield

Our garden design and build service is for Lichfield owners who want to keep their land and have a new home built on it, managed from the first appraisal to handover. We cover Lichfield and the places around it, and manage every stage for you.

The order of work is clear. Appraisal and survey come first, then design and the planning application, then Building Regulations, the warranty, utility applications and a written quote. Only then does construction start, in stages with inspections, ending with a handover pack you can pass to a buyer, tenant or family member.

Timber-frame house under construction with scaffolding at the bottom of a back garden, seen from the patio
Planning authority
Lichfield District Council
Postcodes
WS13, WS14
Noon sun, 21 March
About 37°
Shadow from a 5 m eaves line
About 6.6 m
Planning plan
Local Plan
County
Staffordshire

How it plays out in Lichfield

We cover gardens in Lichfield and nearby places such as Burntwood, Tamworth and Rugeley, with the same process wherever you are: a free desktop appraisal, a visit if the plot looks viable, then survey and design.

Some of those places may fall under a different council from Lichfield District Council, and each local planning authority has its own design guidance, validation list and pre-application service. We confirm which authority covers your address at the start, so the application is prepared for the right requirements first time and avoids delays at validation.

Section showing noon sun and shadows in Lichfield: about 37 degrees on 21 March and 14 degrees on 21 December21 m21 Mar, noon: sun 37°, shadow 6.6 m21 Dec, noon: sun 14°, shadow 20.2 mExistingNew home
Noon sun in Lichfield on 21 March sits about 37° above the horizon, so a typical two-storey eaves line (about 5 m) throws a shadow of roughly 6.6 m. In December the sun is only about 14° up and shadows stretch much further. Drawn for a garden facing north, where it matters most.

From first call to decision

If your Lichfield plot already has planning permission, we begin by checking the approved drawings and conditions against the site. Some permissions need detailed design, discharge of conditions or a minor amendment before they can be built. We then prepare the technical drawings, arrange Building Regulations approval and the warranty, apply for utility connections and give you a written quote to build.

  1. Free plot appraisal

    We check the title plan, access, constraints and planning policy from our desk, talk the plot through with you, and visit if it looks viable. There’s no cost and no obligation.

  2. Survey and design

    A measured survey records levels, boundaries, trees and neighbouring windows. We then design a layout and house that suit the plot, the street and your budget, and decide whether pre-application advice is worth seeking.

  3. Planning and approvals

    We submit the planning application and manage it to a decision, then deal with conditions, Building Regulations approval, the structural warranty, any build-over agreement and the new utility connections.

  4. Handover

    You receive the completion certificate, warranty documents, Energy Performance Certificate, manuals and utility details, so the new home is ready to move into, let or put on the market.

Worth checking early

  • Building and selling a new home can change your tax position compared with selling only your house; take advice from a tax adviser first.
  • You fund the build and carry the cost risk; ground conditions, sewer diversions or supply upgrades found later can move the price.
  • Planning can be refused, and money spent on surveys, design and the application isn’t recovered if it is — which is why we start with an appraisal.

Lichfield: questions to ask

How long does planning take for a new home in a Lichfield garden?

The statutory period for deciding a minor application, such as a single new home, is 8 weeks from the date the council receives a valid application, in both England and Wales. In practice many applications take longer, and the council may ask you to agree an extension in writing. Surveys and design before submission add time, and conditions may need approving afterwards.

How close can a new house be to my own in Lichfield?

There’s no single national distance. Many councils use separation guides of around 21 metres between facing back windows and around 12 to 15 metres between a back window and a blank side wall, but the guidance used by Lichfield District Council decides. Window positions, ground levels, roof shape and screening all affect what is acceptable, which is why we survey before we design.

Who decides planning for a garden house in Lichfield?

Lichfield District Council decides applications for addresses in Lichfield, using the council’s Local Plan, national policy and its own design guidance. Neighbours and consultees such as highways officers can comment, and the decision is made by the council’s planning officers or, where the rules allow, its planning committee. Pre-application advice from the council can help test a scheme before the formal application is submitted.

Will I pay Community Infrastructure Levy on a new home in Lichfield?

Only if Lichfield District Council has adopted a Community Infrastructure Levy charging schedule; not every council has. Where it applies, it can be charged on a new home of any size. A self-build exemption exists for people building a home to live in, but it must be claimed before work starts, so we check the position at design stage.