Build a new home in your garden in Tamworth

Building a second home behind your own in Tamworth is a construction project with one unusual feature: you live beside the site from the first spade to the last coat of paint. That shapes how we plan it, from the fence that separates your garden on day one to where deliveries park.

The route covers everything between an idea and a finished house. We survey and design, prepare and submit the planning application, arrange Building Regulations approval and the structural warranty, organise new water, drainage and electricity connections, and then build. You keep ownership of the land throughout.

Timber-frame house under construction with scaffolding at the bottom of a back garden, seen from the patio
Planning authority
Tamworth Borough Council
Postcodes
B77, B79
Noon sun, 21 March
About 37°
Shadow from a 5 m eaves line
About 6.5 m
Planning plan
Local Plan
County
Staffordshire

Before you decide in Tamworth

We cover gardens in Tamworth and nearby places such as Lichfield, Sutton Coldfield and Atherstone, with the same process wherever you are: a free desktop appraisal, a visit if the plot looks viable, then survey and design.

Some of those places may fall under a different council from Tamworth Borough Council, and each local planning authority has its own design guidance, validation list and pre-application service. We confirm which authority covers your address at the start, so the application is prepared for the right requirements first time and avoids delays at validation.

Section showing noon sun and shadows in Tamworth: about 37 degrees on 21 March and 14 degrees on 21 December21 m21 Mar, noon: sun 37°, shadow 6.5 m21 Dec, noon: sun 14°, shadow 20.2 mExistingNew home
Noon sun in Tamworth on 21 March sits about 37° above the horizon, so a typical two-storey eaves line (about 5 m) throws a shadow of roughly 6.5 m. In December the sun is only about 14° up and shadows stretch much further. Drawn for a garden facing north, where it matters most.

From first call to decision

If your Tamworth plot already has planning permission, we begin by checking the approved drawings and conditions against the site. Some permissions need detailed design, discharge of conditions or a minor amendment before they can be built. We then prepare the technical drawings, arrange Building Regulations approval and the warranty, apply for utility connections and give you a written quote to build.

  1. Free plot appraisal

    We check the title plan, access, constraints and planning policy from our desk, talk the plot through with you, and visit if it looks viable. There’s no cost and no obligation.

  2. Survey and design

    A measured survey records levels, boundaries, trees and neighbouring windows. We then design a layout and house that suit the plot, the street and your budget, and decide whether pre-application advice is worth seeking.

  3. Planning and approvals

    We submit the planning application and manage it to a decision, then deal with conditions, Building Regulations approval, the structural warranty, any build-over agreement and the new utility connections.

  4. Handover

    You receive the completion certificate, warranty documents, Energy Performance Certificate, manuals and utility details, so the new home is ready to move into, let or put on the market.

Worth checking early

  • Building and selling a new home can change your tax position compared with selling only your house; take advice from a tax adviser first.
  • A build next door means months of noise, deliveries and contractors near your home; good planning reduces the disruption but doesn’t remove it.
  • Your own garden gets smaller and the new home will be visible from your house, so screening and separation matter for both homes.

Questions about garden plots in Tamworth

Will I pay Community Infrastructure Levy on a new home in Tamworth?

Only if Tamworth Borough Council has adopted a Community Infrastructure Levy charging schedule; not every council has. Where it applies, it can be charged on a new home of any size. A self-build exemption exists for people building a home to live in, but it must be claimed before work starts, so we check the position at design stage.

Do you visit gardens in Tamworth before giving advice?

We start with a desk review of the title plan, access, constraints and planning policy, then talk the plot through with you. If it looks viable, we arrange a site visit to see the access, levels, trees and neighbouring windows for ourselves. The appraisal is free and carries no obligation.

Who decides planning for a garden house in Tamworth?

Tamworth Borough Council decides applications for addresses in Tamworth, using the council’s Local Plan, national policy and its own design guidance. Neighbours and consultees such as highways officers can comment, and the decision is made by the council’s planning officers or, where the rules allow, its planning committee. Pre-application advice from the council can help test a scheme before the formal application is submitted.

Can the new home in my Tamworth garden connect to the main sewer?

Usually, yes, but the route and depth decide how easily. The new home needs its own foul connection, agreed with the water company, and gravity drainage is simplest where the sewer sits lower than the new floor. If it doesn’t, a pumped connection may be needed. Where a public sewer runs under your garden, a build-over agreement or diversion may also be required.

Other options in Tamworth

Build in your garden near Tamworth

Find out what your garden could become

Free garden plot appraisal. No cost, no obligation, and a straight answer if it won’t work.